Today I made 2 pillowcases. I only have a picture of one and they are in the dryer along with the quilt.
Since my sister has arrived for the weekend, I’m in the process of setting up a sewing area in my living room. I need to track down a power strip and then I’ll be good to go. On tap for this weekend is Frolic. I’d love to have all of my blocks completed before the weekend is over.
A customer’s quilt – binding needs to be pressed, then can be attached and stitched down6/6/2020- Allietaire – plan do do both scallops and a 2 color binding.
Narragansett Blues6/11/2020Sister Swap # 3 – The binding is made just needs to be attached and stitched down6/6/2020Then & Now6/7/2020- Baby 4-Patch Stacked Posies
Tablerunner – Finally figured out what I am going to use– 6/7/2020- The quilt with the striped backing needs a label and delivered
- I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and
23 6-inch blocksas of 6/12/2020- 5 6-inch blocks made 6/13/2020
- 2 12-inch blocks made 6/14/2020
- 6 6-inch blocks made on 6/16/2020
- 12 6-inch blocks made on 6/20/2020
- 2 12-inch blocks made on 6/21/2020
- 3 12-inch blocks made on 6/22/2020
The log cabin quilt needs to be quilted, bound and labeled.– 6/24/2020- The blue, black and white quilt is my Frolic the goal is to finish the top.
Although not quilting, there are 8 pair of pants which need to be shortened.- 2 pair hemmed 6/8/2020
- 2 pair hemmed 6/9/2020
- 1 pair hemmed 6/12/2020
- 3 pair hemmed 6/13/2020
- Bonus #1 – Pillowcases:
the customer quilt6/6/2020- Allietare
- Narragansett Blues
Log cabin quilt (2)6/25/2020
- Bonus #2: Pillowcases for quilts already completed
- Christmas Crazy 8s
On Ringo Lake6/16/2020- En Provence (2)
- Carolina Chain
Good Fortune6/16/2020
- Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.