Quilting and Stuff by Knitnoid

February Quilting Accomplishments

total Feb

 

Here’s my February recap:

  • Make “visible” progress on my Double Wedding Ring – DONE — well visible progress was made.  I still have two more rings to quilt
  • Finish Deadline  III – DONE
  • Make the “N” blocks for the Alphabet BOM. – DONE
  • Make progress on Eeyore – Didn’t touch
  • Bonus – Finish Scrappy Trips. – I need to make the backing and buy batting. – I did by batting, does that count?

I got distracted. There was the baby quilt from the Deadline III pattern; applique flowers started (what’s up with that?) and a bit of knitting.

There’s no picture of the knitting but night before last I got to the last row before the border and decided I need to make the shawl bigger, so I think I need to do 6 more repeats. But then I dropped a stitch and I’ve got to rip back to fix it — that’s what happened to my other twisty pin – it’s stuck in my knitting.

Anyway I hope to get back on track with quilting starting with a retreat I’m going to this evening and tomorrow. How much retreating I get done will depend on how much I get called from work. Fortunately I’m only 20 minutes away so I can do both.

Comments are closed.

Post Navigation