I’m a few days late with my March Recap. Mostly because I didn’t want to report that I didn’t make my goals. For March I had 5 things on my goal list:
- Make “visible” progress on the Double Wedding Ring
- Make progress on Eeyore
- Make the “O” block for the Alphabet BOM
- Make progress on Orca Bay
- Bonus – make the backing for Scrappy Trips
“Visible” progress on the DWR means I can color in another section on the icon on the right. I didn’t even get one arc quilted in March.
Progress on Eeyore – well, I did trace off the patterns, but I hoped to have more progress.
The “O” block did get made.
Orca Bay is now ready for Step 7.
Not having completed the first 4 goals, I didn’t even attempt the Bonus goal.
But, I’m no longer feeling sorry for myself. In addition to the work pictured above, I really did get a lot done in March — just not the things I planned.
At the quilt retreat I made the Shamrock block. The modified 9-patches are for the Jared Takes a Wife quilt-along (the 4-patches were formerly my leader/ender project).
I quilted the red, white & blue quilt and made matching pillowcases to ship off for a birthday gift. Then I started a baby quilt, only to get bogged down in the border.
I finally attached a hanging sleeve to the mystery quilt that I designed so it could be photographed. The musical green pouch keeps the tools together my husband uses to fix music stands at school.
Not quilting, I finished this knitted shawl.
Then I started another one in much finer yarn and made a mini 10-minute runner.
I definitely got more done in March than I thought.
We are busy sewing and quilting. It’s good to look back and see what has been completed the end of the month. Good Job making March a time for impromtu quilting projects.