Last week’s goals
- Finish quilting and bind the 1000 Pyramids – DONE
- Every day quilt on my DWR. – 6 of the 7 days
- Clean the sewing room. – DONE
It’s a good thing I didn’t have much more planned. I’ve been rather listless. I think it’s the clean house and sewing room – I don’t want to mess anything up. It has however afforded me plenty of time to work on the DWR.
I’ve got the DWR in a laundry basket and it sits beside my recliner with a basket of supplies on the table (I don’t pretend to be a decorator). In the evenings I watch the summer dramas on either USA or TNT and quilt. With the new hoop, my wrists aren’t giving me as much trouble as I was having on the floor frame. I think it’s because I can change positions more easily.
So what’s up for this week?
- Continue working on the DWR. I need to complete a ring every two days if I’m to finish this quilt by November.
- Make the this month’s KVQG block – the meeting is Monday!
- Make at least one Sylvia’s Bridal Sampler block – 4 or 5 would be better.
- Make progress on Oklahoma Backroads. I have all the blocks sewn together in pairs
Check out what others are have planned by following the links over at Bari’s.
You have made a bunch of progress.
The quilting on your DWR is looking great! Isn’t it nice to have something to work on while sitting in front of the TV?
Congratulations on cleaning your sewing room! That is quite an accomplishment! I looked back in your posts and found the picture…very nice!
Your list for this week looks do-able.