It’s been two weeks since my last post and I’ve been busy working through the projects that I had going at the beginning of the month.
- Christmas Star Swap – quilted and needs to be bound
- Squedge 18 degree table runner – needs to be quilted.
- Community Quilt – quilted and delivered, so not pictured
- Auction Quilt – quilted and delivered, so not pictured
- Postage Stamp Leader/Ender – dormant, but I’ve added 1 1/2″ squares to the basket
- Pink, Green, & Purple Quilted Sweatshirt- no progress
- Sheet to make body pillowcase – no progress
- Fairy Frost Sunset pillowcase – done
- Christmas Star Swap pillowcase – no progress
- HST for Rivanna – nearly 2 batches stitched (that’s 120 HSTs!) I have another 120 ready to go.
- Kimberly from Stripology 3 – squares cut and ready for class
- Tara from Stripology 3 – ready to trim and bind
- Crystal from Stripology 3 – cut out and first column assembled
Here’s where I started from:
Take note of the fabric in the bottom left corner of this picture. All that is left is this:
After I get the 3 quilts bound, I think I’ll have enough to make a pillowcase. As for the rest of the fabric, I haven’t decided if it will go in the stash or if I’ll squeeze one more project out of it.