Yes, I’ve taken down Orca Bay. It’s January 2nd and I’ve got to get this Ocean Wave’s quilt done by mid-May and there are still 464 HST squares to be stitched — not to mention the actual assembly of the blocks, the quilt top, quilting, binding and a label. This part of the quilt is up on the wall to remind me to get it in gear.
I’ve also been working on my January UFOs. It’s a 3 part deal — the block from the Christmas quilt — the pattern is still leaning against my computer; 2 SBS blocks (book is on other computer) and one ring of my DWR.
That, I made progress on Sunday. The center of the ring I quilted is off to the right. Up next is the pieced section surrounding the melon. I may work on that tomorrow evening. — Anyone noticing I’m not jumping out there to work on the cookie jar? It’s that appliqué thing.
There should be some great design walls over at Patchwork Times – check them out..
After working on Orca Bay, 464 HSTs may not seem like all that many. LOL
VERY pretty Ocean Waves quilt.