Oh, my. Such grand plans for the 1st quarter and no finishes to show for it. I did complete 2 quilt tops, but those don’t count for this challenge. I nearly decided to not enter the 2nd quarter challenge, but why not. The worst that can happen is I don’t finish anything again.
As with the 1st quarter (not that it helped me) I’m going to list everything that I have started, or am considering starting. But first the main objectives.
April – May – June
- Green & Cream Swap
- Compass Lone Star
- Blue Disappearing 9-Patch
- Music Throw
- Turquoise and Green Strip Twist
- Monochromatic Tablerunner
- Alletore
It’s unlikely that I’ll finish all of these projects. I’ve promised myself I ‘get’ to work on Alletore through Saturday night, then I’ll resume working on the Green & Cream Swap quilt. I’m attending two quilt retreats this quarter, so I’ll work on Alletore, Strip Twist, and the backing for the Blue Disappearing 9-Patch.
But just in case I come up for air, there are tops waiting to be quilted:
Pink & Brown, Christmas BOM, Scrap Patch Hearts
Black & White 4-Patch Stacked Posies, Christmas Crazy 8’s, Moda U
Raising Cane, 2012 Spring Mystery #2, 2008 Retreat Swap
Baby B&W 4-Patch Stacked Posies, Whitework, Stack ‘n Wack
Thangles BOM 1, B&W Strip Twist, Old Tobacco Road
Machine Quilting Sampler, Fairy Frost Sunset, Twin 2011 Mystery
QIAD Christmas Row, Mom’s 4-Patch Stacked Posies
Baby 2011 Mystery, Estate Doves in the Window
And quilts still in pieces:
Lee’s Baskets, Mom’s Thangle BOM, Hancock Stars BOM
Border Class Sample, Sylvia’s Bridal Sampler, ‘Twas the Night Before Christmas #2
Sheryl’s Churn Dashes, Green & Cream Swap, Alphabet BOM
Hexie Hand Project, L/E Tumblers, ‘Twas the Night Before Christmas #1
Mom’s Sweatshirt, Sister’s Swap Blocks
Just Takes Two, Estate DWR, Compass Lone Star, Candy Sunflower Seeds
QAYG Strings, Postage Stamps, Faux Applique, Blue Strings
Redwork Snowmen, Jane’s Hourglasses, QIAD Flying Dutchmen, Allietare
String HST Wall Hanging, Lee’s Christmas Blocks, Lillbet’s Garden, Star-A-Day
Not to mention a few kit’s I’m considering for this year:
Tuscan Sun BOM, MayPole Bags(?), The Night Before Christmas
“Aug 2013 Quilt A”, Triangle Frenzy Runner
Squedge Ruler project – hopefully a 12″ x 30″ table runner
See what other’s are planning for the 2nd quarter over at the Link-up.
You have a lot on your wall today! Glad you have a couple retreats to go and get some heavy duty sewing done. Allitare’ is coming along one block part at a time.