These are not my quilts. My sister came to visit to use the long arm and stay with me after surgery. In the 3 weeks she was here she put in 1,064,708 stitches on the longarm and used 25 + yards of batting. With the exception of the table runner on the right which just needed binding, the rest were quilted and bound while she was here. Two of the t-shirt quilts (the one with the pink shirt and the one with the ‘safety’ shirt) were pieced. Additionally, she quilted & bound the table runner shown below.
So, what have I been doing?
Over the weekend, I finished piecing the squares for Eclipse. I have 2 rows sewn together. I hope to get it finished this week. I also pulled out Rivanna and I’m piecing 9-patch sections as my leader/ender. Once Eclipse is a top, Rivanna will become my main project and the Color/Netural 9-patches will slide back as my leader/enders. I just have blue, turquoise and purple squares to go.
On the handwork front, I added the blue hexie to the ‘wing’ and attached the wing to the center. I need to find a different size needle to work with that doesn’t stress my hand. The next time I pick up this project I’ll be prepping the hexies. Over the weekend I cut more light, pink and blue. I have enough green to make the round. I just need to decide if I’m going to do the round, or do another ‘wing’.
I also need to deal with this pile of fabric. It’s stuff my sister left for me.











