Quilting and Stuff by Knitnoid

A New Door Wreath

It’s February, so time for a new door wreath.  This has been hanging in my sewing room for a few weeks.

Two thirds of the seafoam HST are made and trimmed.  I’ll knock the rest out after work and start assembling the broken dish units.  I really would like to have the top done by the time my backing fabric arrives.

I bought a Big Dream Dahlia and a Big Dream Dance panel in the Hummingbird color way to see if they would work color wise with the wedding quilt .  The answer is a resounding Yes.  I’ve ordered another 8 of the Big Dream Dance panels and will make a big 9-patch to use for the backing.  I expect the panels to arrive on Friday, but it will be at least a week before I start to quilt this quilt, as I’ll do the practice quilt first — just as soon as I figure out how I’m going to quilt it.

  • 350 Challenge = 57
  • Easy Breezy = 102

Comments are closed.

Post Navigation