This month I hope to spend more time in my sewing room. I don’t have to work any weekends, so that will help tremendously. My Double Wedding Ring and my Sylvia’s Bridal Sampler quilts have not been touched for months, so I really need to get back to these two quilts. Naturally there are other bits and pieces I’d like to accomplish as well.
- Keep up with the SBS BOW and the monthly Offline Quilters’ challenges. This month the goal is 5 blocks on row A. Who knows what the BOW will bring. The end result should be 10 more blocks toward the 140.
- Three 12″ blocks – two are for a swap and one is the KVQG BOM. I should get the BOM pattern sometime next week.
- Quilt, Bind and Label the baby 1000 Pyramids – since I’m waiting for the baby to be born, the label might roll to September.
- Resume quilting on the DWR. I’ve taken the quilt from the floor frame and put it in the lap hoop. Last night I worked on it for a while. I’ll get back to you on how I like the hoop.
- Finish piecing the Star Struck blocks. This would be a good project for a sew-in with my quilting buddies. We haven’t had one of those for a while.
- Quilt my Texas Braid. Alright, I admit it. This is my long shot.
Will I finish everything I’ve put out on my list? Who knows. Check back with me through the month to see.
I didn’t do any of the blcoks for the July Challenge. I think I have a few to make in the A row,. But if they have “Y” seams they aren’t getting made this time! My MIL quilts on a hoop. It always makes me cranky if I have to use one now that I’ve used a Longarm with Computer patterns.