It’s good that I recap what I accomplish each month or I would think I get nothing done. Much of July was spent working in the yard and or reading. But then I realize I really did get a few things done.
As part of the yard work, I repainted our windmill. The center of Eeyore was quilted. A set of placemats and coasters was made. I finished quilting the Double Wedding Ring. I made the June BOM block and started on the July block, although I forgot to use muslin as my light. I did some of the embroidery on the next to last block of the Christmas BOM. Not pictured, on the 1st, I finished “the forgotten quilt”.
So, what do I have planned for August?
In no particular order:
- Finish Eeyore
- Make the June, July and August blocks (R, S, & T)
- Attach the binding to the DWR
- Clean up the sewing room — it’s gotten deep.
There are other things which need to be done as well – labels and pillowcases for at least 5 quilts; get Scrappy Trips done – I still need to make the backing; start the quilt I’m making for a friend’s church auction and possibly quilt, bind and label another quilt for a gift if I can arrange time on the long arm at the end of the month. And of course this short list doesn’t put a dent in my 2014 Goals which is a just a small subset of my master UFO list.