I’m not able to take Friday off and I’m working on Monday, so this really isn’t a long weekend – I’ll get that next week when I take off a noon to go to a local retreat.
So what do I plan on working on this weekend? These three quilts. The red, white and black needs a binding — I have a bit of leeway – I don’t think it needs delivered until the 6th, but I may get the call earlier. I’ll work on it tonight after dinner since it’s the easiest/quickest to do.
That mass of brown and batting? That’s a quilt that I quilted a while back (October 2013) that I didn’t like the quilting on. I was encouraged to just bind it and call it done, but I can’t do it. But the good news, is I’ve had a flash of inspiration and know how I’ll quilt it when I get the original quilting ripped out. Fortunately it is a relatively small quilt (60 x 71). My deadline is June 1st.
Then there is Eeyore/Piglet. I need to get this done – as in quilted, bound, labeled & washed – by the 6th.
So, the weekend is binding, ripping, quilting and applique — and going to the Lee’s Summit Symphony Showcase Sunday afternoon. I wonder what I’ll have done by Monday?
Sorry you have to work. The bindings are the Fun part. Un-quilting has taken my time this week already, now I’m ready to re-do it.