Quilting and Stuff by Knitnoid

Stash Report Week # 41

Two weeks in a row with no fabric coming into the house. Tomorrow night is the Kansas Trouble Stash Society meeting so I’ll be in a quilt shop for at least an hour, so there is no telling what will come home with me. At least 1/2 yard of Kansas Trouble fabric.

After Monday’s marathon sewing, I was only able to spend 10 or 15 minutes at a time at the sewing machine. But still I accomplished a bit. Finished another 9 sashings for Ladder to the Stars and added arcs to both sides of 12 melons for the DWR. Saturday I had more time and it all went to the the SBS Block.

Fabric Added this Week: 0 yards
Fabric Added to Date: 281.583 yards

Fabric Used this Week: 1.125 yards
Fabric Used to Date: 76.054 yards

Net Stash: +205.529 yards (162.583 was gifted)

See how others are doing with their stash over at Patchwork Times.

One Thought on “Stash Report Week # 41

  1. Dianne B. on October 12, 2009 at 3:27 am said:

    I think you've accomplished a lot! That's a good report. 🙂 Take care, Dianne B. in England

Post Navigation