Quilting and Stuff by Knitnoid

Three Finishes

It’s only Tuesday and I have 3 finishes!

First up is Blue Waters.  It’s one of the of  my 2024 Brandon Quilters Block of the Month quilts.  It’s been waiting to be bound since either August or September.  I have 2 different dates in my notes.

  • Started 12/9/23
  • Finished 4/27/25
  • Size: 66″ x 83″
  • Used 2+ bobbins of Glide 40wt in Mercury
  • B2B (border to border) Bubbles

Next is one the Brandon Quilters President’s Challenge quilts.

I brought the blocks home after the April meeting. I just assembled, quilted and bound the quilt.

  • Started from blocks 4/26/25
  • Finished 4/27/25
  • Size: 40″ x 56″
  • 1 bobbin of Glide in Passion
  • E2E design – Espallier increased in height to 19″.

Finally, my Blooming 9-Patch that I’m calling Dragonfly Garden.  

This was a sew along with the Gulf States Quilt Association. I didn’t get the top done before the meeting, but I finished it in less than a month.  All the fabric, including the backing came from stash.

  • Started 4/3/25
  • Finished 4/28/25
  • Size: 75″ x 92″
  • 4 bobbins of Glide in Magic Mint
  • E2E design – Dragonfly Dance, enlarged to 15″ tall

Leave a Reply

Your email address will not be published. Required fields are marked *

Post Navigation