Quilting and Stuff by Knitnoid

UFO Progress

The monthly UFO Progress report is late.  First it was computer issues and then it was procrastination, thinking I’d get the two blocks finished.  It hasn’t happened yet, so here’s my report.

The March # was 8.  That was the Ohio Star that I finished early on and the bells, which I did get fused in place — after midnight on April 1st.  So, I’m only halfway there for the month of March. I did get two Sylvia’s Bridal Sampler blocks made, but I did no quilting on my Double Wedding Ring.   March apparently wasn’t a good month.

So, onward to this month’s UFO #.  It is 10, which is the Holly Wreath.  So far so good.  I’ve cut out all of the leaves and picked my background fabric.  I still need to find fabric for the bow and cut out the berries.  Once I get these pieces fused into place, I’ll stitch down the applique on both blocks.

The links over at Patchwork Times will show how others are doing on their UFOs.

2 Thoughts on “UFO Progress

  1. Diane Kelsey on April 8, 2012 at 4:58 pm said:

    As long as some progress is made, that is positive and a way forward.

  2. Pingback: UFO Progress « Quilting and Stuff by Knitnoid

Post Navigation