This week I’ve got 4 things going on — all of which MUST be done by Friday morning.
First up finish binding Eeyore. I’ve got about a foot of the binding attached to the front of the quilt.
Next, cut this pile of fabrics into 320 2-1/2″ x 4-1/2″ bricks for Syd to use in her new quilt — neither of us are quite ready for her to use the rotary cutter.
Then I need to finish cutting this pile of FQs and yardage for the quilt I plan on working on this weekend.
Finally I need to get this top and the backing on the zippers. I have a date with the longarm Friday morning.
I don’t know if my quilting mojo is back, but all of this stuff simply has to be done.
Check out what others have on their design walls over at Patchwork Times.