Quilting and Stuff by Knitnoid

Category Archives: Uncategorized

What’s On My Design Wall

spooltop

Over the weekend I finished my Spool quilt top, finally adding the borders. This was last year’s Leader/Ender challenge over at Quiltville. It’s been added to the box of tops to be quilted.

At the moment I’m not doing this year’s Leader/Ender challenge – Split 9-Patch. When the challenge started, I was working on my Postage Stamp L/E project. I ran out of those pieces a few weeks ago and didn’t want to stop and cut more, so I pulled out a stack of green and white 2 1/2″ squares. I’ve been sewing them into 4-patches which I currently have tossed up on the design wall.

Check out what others are working on by following the links over at Patchwork Times.

Stash Report – Corrected!

I’ve had to correct my report!  I just counted the border fabric and completely forgot the fabric for the blocks cornerstones and sashing!

Most of the week was spent pressing and cutting my scraps into usable bit and pieces, but Saturday night I finally got the borders on my 3″ Spool block quilt — pictures tomorrow.  I did order a charm pack, but it has not arrived, so I’ll count it when it gets here.

Fabric Added Since Last Report: 0 yards
Fabric Added to Date: 164.037 yards

Fabric Used Since Last Report:  1.444 yards 9.068 yards
Fabric Used to Date: 106.267 yards 113.891 yards

Net Used for the year -57.77 yards -50.146

See how others are doing with their stashes over at Patchwork Times.

Enough Scraps For Now

scrapbasketfull

Several days this week I’ve spent time pressing and cutting my scraps into manageable usable pieces.  The pickings in several of my pre-cut boxes were getting pretty slim, but I’m happy to report that now there’s a good selection.  But my rotary cutter is wore out from prepping pieces for “Future Quilts” and I need to work on a couple of more pressing items.

So, the remaining scraps, including the pile I pressed yesterday, has gone back into the basket on the shelf. At least it’s no longer overflowing.

 

Friday Night Quilting

dwr1108

 

It’s been a while since I worked on my DWR.  Tonight I finished quilting two of the outer arc/melon sets.

Tomorrow it’s back to work on Josh’s quilt.  I understand the forecast for next week is the high will only be 32 degrees farenheit. He may want his quilt back before then.

The Scraps are Multiplying

On my list of things to do, is to rearrange the stuff on my “extra” shelves so all of the quilting overflow is on a single set of shelves. I didn’t think to take a “before” picture, but here’s a picture from July to give you an idea of what I was up against:

shelvesJuly

I’m not there yet, but I’m getting closer.

shelves1107

Fabric from my mom and a friend’s mom was found in some of the boxes — more than I remember having. (That’s a good thing).  In fact, I did the quilt along using all floral fabric to use up some of my florals, only to end up with more floral fabric than I started with!  Not because I went shopping, but because I opened a couple of boxes.

Now to the multiplying scraps.

In the first picture, the pile of fabric/scraps on the ironing board appears to be my orphan block box.  I got it “under control” back in July.  What you can’t see is the red basket on the shelf full of scraps and bits & pieces of leftover fabric dating back to 2011.  I  haven’t been keeping my scraps cut up.

Tuesday night I dumped the red basket into a laundry basket so I could root around and pull out the larger pieces and put them away.  I tell you the scraps multiplied.

scrapslaundry

They filled up the laundry basket which is nearly twice as big.  Then I turned around and spotted another laundry basket – this one with shirt scraps.

scrapsshirts

Clearly I have some work cut out for me. But when I get it done I’ll be ready to start accumulating scraps again in my newly labeled basket.

scrapbasket

One Third Done

josh-onethird

One third of the quilt has been re-quilted.  Ten more blocks to go.

 

LED Lighting

ledlightingmachine

ledlightingquilt

Earlier this week my husband embarked on a lamp project for his music room/office. While looking on Craigslist for a lamp he could cannibalize for parts, he found the “perfect lamp” and we drove half way across the state to get it.  After bringing it home and studying it, he decided it needed a few modifications, which in turn has resulted in numerous trips to the assorted hardware stores.

One of the things he bought is a 75 watt equivalent LED Daylight bulb. That darn thing is pricey! But look what it can do.

The pictures above were taken about midnight with only two lights in the room — the LED bulb in my task light fixture and a large compact fluorescent bulb in a floor lamp approximately 5 1/2 feet away from the sewing machine.  The flash on my camera was turned OFF.

Guess what just got put on my wish list.

As for the perfect lamp I’ll post a picture when he gets it put in his office. It really will be the “perfect lamp”.

What’s On My Design Wall

dw1104

Work continues on Deadline Project 2 and Josh’s quilt repair. While piecing I’ve been making green and white 4-patches since that’s what I had in my pre-cut box, but I only have a few more left.

Then I got distracted. I needed to clear a space to set up a vintage aluminum tree to photograph it to see about selling it.  Everything got shifted around and when I boxed up the tree, I was determined to take down the little table that had a pile of fabric on it from my last two (or three) projects.

The birthday quilt and leftover fabric is in a bag ready to go to V for quilting. I folded a stack of leftover fabric and put it away and now I’m tackling the scraps which were on the table. Eventually, I’ll need to deal with that red basket just visible on the right side of the picture and that laundry basket on the floor on the left. Oh, and it would be nice if I could clear a space on the shelves for that box hiding behind the iron cord in the picture. It’s the one containing the tops which just need borders.

Hop over to Patchwork Times to see what others are working on this week.

Stash Report

Lots of piecing this week, but only the fabric for the tie shows up in the stash report. The pattern calls for 3/4 yards of two different fabrics, but since I’m a scrappy quilter I figured I really only used 1/2 yard for both sides, given that I can cut up the rest of the fabric for something else.

Fabric Added Since Last Report: 0 yards
Fabric Added to Date: 164.037 yards

Fabric Used Since Last Report:  0.5 yards
Fabric Used to Date: 104.823 yards

Net Used for the year -59.214 yards

See how others are doing with their stashes over at Patchwork Times.

Bonnie Quilt Challenge Update

jo-bhchallenge1026

 

I just read Jo’s post over at Jo’s Country Junction.  Oops.  Guess what I left off my November/December quilting goals. Not only that, the quilt and border fabric has been put in a project box  I seem to have misplaced the quilt in the cleanup from last week!

I know I did something with it because the label 3″ Spools is missing from the new labels I made.  On the master list I’ve written “4” beside the listing.

projectlistblog

And from my legend I now know that I’m looking in the wrong place.

projectledgendsm

 

It was with this last clean up that I started putting “active” quilting stuff over on the shelves on the other side of the room. No wonder I wasn’t able to find the quilt top during my quick searches.

But even knowing where to look didn’t seem to help me. So one more turn around the sewing room, then I spotted it.

I setup a box for those quilts that are just need borders – only there’s no room on the shelf for them yet.

oppositeside

 

It’s sitting on the floor.  Whew!  I really didn’t want to have to re-clean my sewing room to find this quilt.

I think I’m going to aim for next weekend to get the border on the quilt.  I have a long weekend and perhaps I’ll be done with the piecing on Deadline Project 2 and the re-quilting of Josh’s quilt.

Check out the links over at Jo’s Country Junction to see how others are doing on their challenge quilts.