Last week’s goals
- Bind these 3 quilts: Blooming 9-Patch, Illusions, and the 2011 Mystery Quilt. – DONE
- Assemble, quilt and bind 2 more President’s Challenge quilts – DONE
-
- Make a charm tote bag. – DONE
So what’s on my list for this week?
- Make the rest of the Lemoyne Stars for the Compass Lone Star quilt.
- Find something to use for my Leader/Ender Project — I’m thinking it will be my Rainbow Charm Swap.
- Clear the tables AGAIN and go through at least 1 of the DOOM bags.
I took my main machine to the Sit-n-Sew and when I got back I thought I would clean it since I’ve been sewing so much. This is the accumulation after just 2 weeks.
That led to resuming the deep clean of the quilt studio that I started several months ago. It always looks worse before it gets better.
But I wiped down the window sills, baseboards and swept behind and under the middle table and sewing table and circled back and swept behind the other table as well.
But I was eager to get the bindings on the two challenge quilts, so nearly everything on the sewing table got swept off into those 2 bags sitting on the floor next to the broom — aka DOOM bags — Didn’t Organize Only Moved.