The computerized quilting is finished on the wedding quilt. I’m now working on the continuous curves.
I have the quilt rolled and I am ready to start the next section. My goal is to have the quilt off the machine by this weekend. I have someone bringing me 3 tops to quilt and I’d like to work on them next week while I’m off from work.
While the computer was finishing up, I made 3 more blocks for Louisa Lattice. The blocks really are quick to do, but I can’t be manually running the long arm and sitting at my domestic machine at the same time. I may just try to do 3 blocks a night just to say I’ve worked on the quilt.
I’m linking up with Small Quilts and Doll Quilts for Design Wall Monday.
- 350 Challenge March = 16
- 350 Challenge Cumulative = 130
- Easy Breezy = 126