Quilting and Stuff by Knitnoid

Getting It Done

Since Judy announced this year’s challenge of Getting It Done, I’ve been thinking how I wanted to use it.  Picking one quilt to focus on last year worked pretty well, so should I do that with my Just Takes Two or Sylvia’s Bridal Sampler? I think if I focused on either of them I would have a top by the end of the year.

But, what about that lengthy list of UFOs? There are 34 quilts on that list — not to mention another 36 tops which need to be quilted!

Since neither the JTS or SBS quilts are priorities (i.e. have destinations  identified yet), I’m going to simply go with the flow.

  • Bind the 2006 Retreat Mystery quilt
  • Make TNBC block using Faux Applique technique
  • Complete the center of the Eyeore quilt
  • Work on the Double Wedding Ring Quilt

I’m sure I’ll do other things this month as well, but I really want to get these four things done.  To see what others are planning on doing this month check out the links over at Patchwork Times.

2 Thoughts on “Getting It Done

  1. I think Judy L took her idea from your lists last year. It hopefully will be more do-able. Easy to show progress at the end of the month.

  2. I like your list. I don’t feel so bad reading how many you have on your UFO list, and your list of your quilts needing quilting. I had 25 quilted the first year I retired, but that was a long accumulation. Now, I only have a few. Good luck with your list this month.

Post Navigation