Quilting and Stuff by Knitnoid

Quilting Goals for April and 2nd Quarter 2015

By now I’m sure you realize I dream big and set out to finish more than I can possibly finish. Fortunately, it doesn’t bother me. Eventually I’ll get tired of seeing something on the list and either get it done or take it off and replace it with something else that may or may not get done. So here is my list of quilting goals for April.

#1 – At a minimum, finish the graduation quilt top. Graduation is May 16th!
gradquilt0331

#2 – At a minimum, finish 30 stars of the Star-A-Day quilt. Unless I catch up, I’m going to need to rename this quilt to Star-Every-Other-Day as I only have 111 done and I should be sitting at 212. (This is an old picture)star-a-dayDW0316

#3 – Quilt & bind Orca Bay. The top is done, I have the backing and batting so what am I waiting for?
orcabay-top

 

If I would just stop there, I might get it all done – even if I am working every weekend except Easter weekend this month.  But I also want to use this post for the 2nd Quarter Finish Along hosted by Adrianne at On the Windy Side. Then there is my personal challenge of trying to get everything started earlier than 2007 done (by the end of the year), but at the same time hopefully get a couple of newer quilts finished as well.  Even though the rest of this post covers three months, it is still unrealistic, but I like options.

These are the projects I’m leaning toward taking to the quilt retreat in June. A couple of PIGs and newer quilts have slipped into the mix. Of course I may change my mind half a dozen times before I get that far.

RETREAT

Sweatshirt jacket, Hardware, String HST wall hanging/doll quilt, August 2013 Quilt A, Sew Scrappy and Candy Sunflower Seeds.

If I’m ‘saving’ these for June, then I need something to work on in May.  How about these partially quilted quilts.

partialquilted

Green & Cream Swap, Hancock Stars BOM, Compass Lone Star, Diamond Links (pic from before I started the quilting)

If I decide I simply need to QUILT something, these are tops are waiting in the wings and I have batting and batting for.

tops

Christmas Crazy 8s, Scrappy Hearts, Yellow Thangles, Christmas BOM and Stack-n-Whack (which might not have a backing now that I think about it, but the age is right.)

Then there are the two blocks sets I’d like to get made into quilts.

blocksets

Sisters Swap from 2005 & Alphabet BOM which was finished earlier this year

Finally, there is the hand quilted whitework piece that is from 2005.  I might not have enough handwork to do with just the Stars 😉 (That’s Diet Dr Pepper, not rust stains.)

07-whitework

So there you have it. My completely unrealistic goals for the April – June.  I’ll be happy to get 3 projects done, but I always like to have options.

All of March’s Quilting Goals Met

Ha! April Fools!

I started to title this post “No More UFOs”, but I know no one would have believed that. Meeting all my quilting goals on the other hand, might have happened, but didn’t. I simply couldn’t get motivated to do what I set out to do at the beginning of the month. That is not to say I didn’t accomplish a few things on my list and several more that were not.

  • 19 Star-a-Day Blocks – goal at least 31 blocksdw0323
  • 17 of the Eye Fooler/Graduation Quilt Blocks – goal the center of the quilt topgradquilt-4wall
  • Pieced most of the rest of the units (I found green HST that need to be made!)gradquilt0331
  • Got the blanket binding on this pre-quilted panel that had been sitting around for 3 monthsbear
  • Sorted through one of the scrap boxes, emptying it, only to toss the neutral and browns back in it to clear the ironing board. The scraps on the left need to be cleaned up for my pre-cut boxes and the ones on the right are for my Star-A-Day quilt.sortedscraps
  • Combined two partial sets of RWB blocks into two quilt topssampler pair
  • Took one large quilt top and made it into two smaller topsStarStruck Pair
  • Took another not quite finished top and made it into a smaller topblueridgeevolution

I’ll reset my goals and see what I can get done in April.

While Searching for a Backing

bear

Earlier this week while searching my stash for the Orca Bay backing, I found a bag with this pre-quilted panel and blanket binding.  I was given it back after Christmas. So, I pulled it out and finished it.  What was I stalling for?  And the backing? I didn’t find it.

So, this evening more digging.

Look what I found!

postagestamp0326

My postage stamp blocks. I’ve been looking for them for at least a week, maybe longer as I have more pieces to add to the bag.  I’m looking for a quilt a little over twice as big and I really think I was aiming for 4 times as big.  Ask me again when I get it to 48″ x 60″, another 1520 squares away.

And the backing.  I finally found it.  So naturally I think I’m going to work on the graduation quilt. It’s needed in 7 weeks, and Orca Bay won’t be needed until it’s cold again in Atlanta.

 

What’s On My Design Wall

dw0323

 

This past week I’ve been playing with my stars.  10 new stars.  As you can see Orca Bay is not yet sandwiched. I really need to do something about that this week. Or work on Eye Fooler.  It’s still sitting on the corner of my desk.

Click over to Patchwork Times to see what others are working on.

Stash Report

The primary thing I’ve been working on this past week is the Stars.  All of that a fabric will get counted when the top is complete — which at this rate will be August 2016, not August 2015 — but I’m having fun picking out fabrics from my scraps.  I might have fabric to report next week.  I’m gearing up, at least in my head to quilt my Orca Bay.

I’m considering quilting it in concentric circles — but I’m not sure there is enough space on my sewing machine. I’m confident there is on the treadle, but I’m equally confident that I’m not coordinated enough to treadle, stitch a smooth curve and wrestle a large quilt at the same time. It almost makes me want to see about getting the motor rewired just to try.

Fabric Added Since Last Report 0 yards
Fabric Added to Date: 18.91 yards

Fabric Used Since Last Report: 3.533 yards
Fabric Used to Date: 20.497 yards

DECREASE in Stash to Date:  1.587 yards

See how others are doing over at Patchwork Times.

Star 100

Star-a-day-100

What’s On My Design Wall

star-a-dayDW0316

This past week I’ve been working on my stars.  Star #99 still needs a few more pieces of background attached — then I’ve got to pick more star fabric.

So, this past weekend I started working on the Craigslist scraps – the ones I got back in October and whittled down to one crate. I’ve got them sorted by color or theme except for this last little bit in the crate.

scraps-box-dw0316

 

There were piles covering all of my ironing board, but I had to make room for pressing. The blues have been pressed.

scraps-board-dw0316

 

To clear the space, I moved the scraps to my treadle.

scraps-treadle-dw0316

I hope to get through the scraps this week because I need to get back to the graduation quilt.  I was reminded that there’s just two months until graduation.

Check out what other are working on over at Patchwork Times.

Stash Report

I have fabric to report as used this week.  The sashing and cornerstones for the red, white & blue samplers and the bit used for the Boston Common layout of Star Struck.

Fabric Added Since Last Report 0 yards
Fabric Added to Date: 18.91 yards

Fabric Used Since Last Report: 3.533 yards
Fabric Used to Date: 20.497 yards

DECREASE in Stash to Date:  1.587 yards

See how others are doing over at Patchwork Times.

This Week’s Stars

star-a-day-0314

 

Here are this week’s stars.  The turquoise stripe and the neutrals came from my stash. The rest from the Craigslist scraps.

Still Goofing Off

star-a-dayfabric selection

This mess can only mean one thing.  I’m digging for fabrics for my Star-A-Day quilt — the one that’s apparently going to take at least 2 years to piece if I don’t get a move on it.  I’m digging through the scraps I got off Craigslist for the prints and my stash for the neutrals. fortunately I’m finding some neutrals in the scraps as well.