Quilting and Stuff by Knitnoid

Stash Report Week # 40


This week I managed to use a smidgen over a yard of fabric making my SBS blocks, cutting the background for more DWR rings and cutting the background fabric for a dozen paper pieced sashings to Ladder to the Stars (I need 80).

Nothing came in – and I stepped foot into a quilt shop on Friday. (OK, just as the store was closing, as I was waiting to the owner to go to dinner, but doesn’t it still count as being in a quilt shop?)

More fabric might have been used this week, but I traveled to Rock Springs, Kansas for String Romp. My original plan was to sew in the hotel room Saturday on the sashings, but a combination of events resulted in me driving out myself Saturday afternoon, so I didn’t bother to drag the sewing machine. The group above is the 6th grade orchestra that my husband conducted this weekend. The kids were from all over Kansas.

Back to the report:

Fabric Added this Week: 0 yards
Fabric Added to Date: 281.583 yards

Fabric Used this Week: 1.050 yards
Fabric Used to Date: 74.929 yards

Net Stash: +206.654 yards (162.583 was gifted)

See how others are doing with their stash over at Patchwork Times.

Comments are closed.

Post Navigation