Not much happened on the quilting front. I cut the binding for Narragansett Blues, then hemmed 2 pair of pants. I cleaned up a bit of batting and backing from recent quilts, and tracked down some of the fabric for those “bonus”
Here’s what is left to do:
A customer’s quilt – binding needs to be pressed, then can be attached and stitched down6/6/2020- Allietaire – plan do do both scallops and a 2 color binding.
- Narragansett Blues
Sister Swap # 3 – The binding is made just needs to be attached and stitched down6/6/2020Then & Now6/7/2020- Baby 4-Patch Stacked Posies
Tablerunner – Finally figured out what I am going to use– 6/7/2020- The quilt with the striped backing needs a label and delivered
- I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
- The log cabin quilt needs to be quilted bound and labeled.
- The blue, black and white quilt is my Frolic the goal is to finish the top.
- Although not quilting, there are
98 pair of pants which need to be shortened.- 2 pair hemmed 6/8/2020
- 2 pair hemmed 6/9/2020
- Bonus #1 – Pillowcases:
the customer quilt6/6/2020- Allietaire
- Narragansett Blues
- Log cabin quilt (2)
- Bonus #2: Pillowcases for quilts already completed
- Christmas Crazy 8s
- On Ringo Lake
- En Provence (2)
- Carolina Chain
- Good Fortune
- Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.