Quilting and Stuff by Knitnoid

40 Day Challenge – Day 6

Not much happened on the quilting front.  I cut the binding for Narragansett Blues, then hemmed 2 pair of pants. I cleaned up a bit of batting and backing from recent quilts, and tracked down some of the fabric for those “bonus”

Here’s what is left to do:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

Comments are closed.

Post Navigation