Quilting and Stuff by Knitnoid

40 Day Challenge – Day 7

Day 7 of the challenge had me sewing the binding strips together for Narragansett Blues before work and then ripping them out and sewing them together correctly before attaching the binding to the quilt after work. No pants were hemmed tonight.

The status report stands as it did after Day 6.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

Comments are closed.

Post Navigation