Quilting and Stuff by Knitnoid

Category Archives: Narragansett Blues

Then There Were Three

That is 3 starbursts that will go into my quilt. Each one gets a bit faster. Which is not to say they go fast. The last one I made took me about an hour.  I’m struggling with getting the background cut big enough, then orientating it in the correct direction so when I flip it back it covers everything it is supposed to cover.

Meanwhile, I finished the quilting on my SILs Narragansett Blues.  I’ll get both of the quilts trimmed, then I’ll box them up and ship them back to her to bind.

Easy Breezy = 40

 

Another Quilt is on the Frame

This in Narragansett Blues – not mine, but my sister-in-laws.  She gave me free reign, so I picked Overlapping Crop Circles as the quilting design and red thread.

Before I loaded it I need to piece the backing. Two widths wasn’t quite wide enough, so I quickly made some 4-patches and pulled out some blue bricks leftover from when I made my Narragansett Blues.

I have some work to do on the Guild website so I don’t  know that I’ll get it finished tonight or not. My sister is coming out to use the machine Friday, so I’ll have to have it done before then.

Easy Breezy = 40

 

40 Day Challenge – The Halfway Point

Yes, Tuesday marked the 1/2 way point in my self-imposed 40 day challenge.

Here’s a recap.

  1. Bind the table runner, Narragansett Blues, and a customer quilt. Bonus pillowcase.
  2. Catch up on Star Studded BOM (still need to do the June block), bind Sister Swap # 3 and Then & Now.
  3. Bonus pillow case for On Ringo Lake, quilt Log Cabin quilt,  Good Fortune bonus pillowcase
  4. Not pictured – Hem 8 pair of pants with cuffs for my niece’s wedding next month.

 

I still need to bind the log cabin quilt. Sewing the binding strips together was today’s progress, and I hope to have the quilt finished before the end of the week.  This weekend my sister is coming over to use both the long arm and my sewing machine to attach binding to quilts, so I’ll be using my Genie to resume piecing Frolic. Then next week, I’ll see about binding Allietare.

Looking at what is left on my list, I’m pretty sure I can meet all of my goals, with the possible exception of the Frolic top.  But if I miss it, it shouldn’t be by much. Then it will be on to the next challenge — which I’m already thinking about.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 8

Narragansett Blues is complete. As soon as I wash it, I’ll take it out to hang on the line for it’s official portrait and do a complete post on the quilt.

Nothing else was done on the list. My sister was given the OK to travel so she’s coming over in the morning to use the quilting machine. I’ve got to clear it off.  At least this time it’s quilting related stuff and not household goods.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 7

Day 7 of the challenge had me sewing the binding strips together for Narragansett Blues before work and then ripping them out and sewing them together correctly before attaching the binding to the quilt after work. No pants were hemmed tonight.

The status report stands as it did after Day 6.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 6

Not much happened on the quilting front.  I cut the binding for Narragansett Blues, then hemmed 2 pair of pants. I cleaned up a bit of batting and backing from recent quilts, and tracked down some of the fabric for those “bonus”

Here’s what is left to do:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 5

Yesterday I decided how I’m going to bind for Narragansett Blues. I’ll use the blue backing fabric for the binding with the gold as the flange. But that’s not all I did.

I unpacked 2 boxes from the office. I haven’t posted about the changes I’ve made in the living room.  I painted, put in new flooring, purchased a new sofa and recliner and rearranged the furniture.  All of this required moving everything out of the living room and dinning room.  I think there were 32 small moving boxes of books and nicknacks, plus various crates. Most ended up in the back bedroom.  I’ve SLOWLY been unpacking.  Perhaps I need to add unpack boxes onto my challenge.

The first box contained yearbooks. There must be another box because that cabinet was full before the shuffling began.  The second box contained photo albums.

My wedding album is what is missing here. Currently it is on the hearth.  The “leather” cover has gotten sticky over the years so I need to do something so it doesn’t tear up the finish on the table.

But back to the real challenge.  I hemmed 2 pair of pants!

That leaves the following:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge

I’d like to get back to blogging about my quilting. It seems that I generally just post to Facebook anymore.  In one of my Facebook groups someone asked “What are you working on?” For me this morphed into this 40 Day challenge. My goal is to get everything on this list done.

This first picture is a stack of quilts that need to be bound.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down
  • Then & Now
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use

Believe it or not there’s more work in this pile than the binding pile.

The quilt with the striped backing needs a label and delivered

I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.

The log cabin quilt needs to be quilted bound and labeled.

The blue, black and white quilt is my Frolic the goal is to finish the top.

Although not quilting, there are 9 pair of pants which need to be shortened. This is driving the 40 days.

Bonus #1: Pillowcases for the customer quilt, Allietaire, Narragansett Blues, and the log cabin quilt (2)

Bonus #2: Pillowcases for quilts already completed – Christmas Crazy 8s, On Ringo Lake, En Provence (2), Carolina Chain, Good Fortune

Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

It should be an interesting 40 -45 days.