I’ve fallen behind in my blogging. Next week my brother is bringing and installing this custom vanity he made me! So, things have been a bit busy around here. I’ve had to prepare notes for my Vice President since I won’t be at the meeting next week. My brother said he didn’t see why I couldn’t go — then I sent him the list of things I want us to accomplish. He threatened to just ship me the vanity.
So as far as my Goals for last week — I missed all of them. I don’t have any quilting goals for this week. Although, I will be folding the quilts which are currently on the guest bed. After I get that done, I need to start on my sunroom and kitchen.
My brother will be here for a week, then I’m going to AQS Branson to help at the Ritzy Quilting Company booth. When I get back, my kitchen renovation starts. So, in the next 10 day – I need to clear my kitchen and utility room and before that I need to make space elsewhere in my house to everything.
Stash Report for 2/28/2025
I’ve mentioned I’m making 2 quilts for my SIL to give to her sisters this Christmas. Well this is the backing for the 2nd quilt.
Fabric Added Since Last Report: 8 yards (I converted my wide back to 45″)
Fabric Added to Date: 40 yards
Fabric Used Since Last Report: 0 yards
Fabric Used to Date: 10.825 yards
Net Fabric Stash: 29.175 yards
Maybe I’ll get off another post before I leave for Branson, but if not, I’ll aim to post something on March 21st.