Quilting and Stuff by Knitnoid

Category Archives: 2016 Finish-a-long

3rd Quarter Goals

Rhonda's [Quilt] Ramblings
Not daunted by listing out quilting/sewing goals that don’t get finished, here are this quarter’s main goals.
  • Bionic Bagbionic
  • Zipper Bags (at least one – I haven’t decided if I like the other 3 fabrics together.)zipbags
  • The Blue Disappearing 9-Patch — Both the top and backing are made and there’s batting around here somewhere.bluetop
  • Strip Twist – a long shot as it is still in pieces and I have no idea what I’m going to use for the backing.striptwist
  • Cream & Green Swap – This really needs to be done first.andrea-gift
  • Monochromatic Tablerunner – I’m sure there’s something in the stash I can use for the backing.tablerunner

Of course the best laid plans don’t always come to fruition, so I am going to hope if I finish something else it will be one of my numerous UFOs or planned projects listed below:

The quilt tops:

tops2016

Pink & Brown, Christmas BOM, Scrap Patch Hearts, Black & White 4-Patch, Christmas Crazy Eights, Raising Cane, 2012 Mystery, 2008 Retreat Swap, Baby Black &  White 4-Patch, Whitework, Stack ‘n Whack, Thangles BOM1, Black & White Strip Twist, Old Tobacco Road, Machine Quilting Sampler, Fairy Frost Sunset, 2011 Twin Mystery, QIAD Christmas Row Quilt, Mom’s 4-Patch, 2011 Mystery, Estate Doves  in the Window

The quilts in progress:

Pieces

Lee’s Baskets, Mom’s Thangles, Hancock BOM, Border Class Sample, Sylvia’s Bridal Sampler, Twas the Night Before Christmas #2, Sheryl’s Churn Dash Blocks, Cream & Green Sampler,  Alphabet BOM, Hexie Hand Project, Twas the Night Before Christmas #1, Mom’s Sweatshirt, Sisters Swap, Just Takes 2, Estate Double Wedding Ring, Compass Lone Star, Candy Sunflower Seeds, QAYG String Blocks, Postage Stamp, Faux Applique, Blue Strings, String HST Wall Hanging, Christmas Blocks from Lee, Lillbet’s Garden, Star A Day

I probably should have done another picture, but I’ve been having computer issues all week and want to get this posted while I can.

There are a few other things kicking about in the sewing room, but given I can’t find the cutting table or ironing board and haven’t unpacked from the retreat back in early June, I’m not likely to finish those either.

See what others are planning on working on this quarter over at RhondasRamblings.

Edited 7/16/16 4:00 PM — Since I’ve posted this, and the deadline to post our list has not past, I’ve rounded up pictures of the rest of the projects that are kicking around the sewing room.

PIGS

Triangle Frenzy Runner, August 2013 Quilt A, Squedge Ruler Project

kits

The Night Before Christmas, Tuscan Sun

more

May Pole Bag/Accessories, Pineapple Blossoms, Music Throw

tumblerstop

Tumblers

I think that’s everything now.

2016 Finish Along – 2nd Quarter

Oh, my. Such grand plans for the 1st quarter and no finishes to show for it. I did complete 2 quilt tops, but those don’t count for this challenge. I nearly decided to not enter the 2nd quarter challenge, but why not. The worst that can happen is I don’t finish anything again.

As with the 1st quarter (not that it helped me) I’m going to list everything that I have started, or am considering starting. But first the main objectives.

April – May – June

2ndqtr

  • Green & Cream Swap
  • Compass Lone Star
  • Blue Disappearing 9-Patch
  • Music Throw
  • Turquoise and Green Strip Twist
  • Monochromatic Tablerunner
  • Alletore

It’s unlikely that I’ll finish all of these projects. I’ve promised myself I ‘get’ to work on Alletore through Saturday night, then I’ll resume working on the Green & Cream Swap quilt. I’m attending two quilt retreats this quarter, so I’ll work on Alletore, Strip Twist, and the backing for the Blue Disappearing 9-Patch.

But just in case I come up for air, there are tops waiting to be quilted:

tops2016Pink & Brown, Christmas BOM, Scrap Patch Hearts

Black & White 4-Patch Stacked Posies, Christmas Crazy 8’s, Moda U

Raising Cane, 2012 Spring Mystery #2, 2008 Retreat Swap

Baby B&W 4-Patch Stacked Posies, Whitework, Stack ‘n Wack

Thangles BOM 1, B&W Strip Twist, Old Tobacco Road

Machine Quilting Sampler, Fairy Frost Sunset, Twin 2011 Mystery

QIAD Christmas Row, Mom’s 4-Patch Stacked Posies

Baby 2011 Mystery, Estate Doves in the Window

And quilts still in pieces:

PiecesLee’s Baskets, Mom’s Thangle BOM, Hancock Stars BOM

Border Class Sample, Sylvia’s Bridal Sampler, ‘Twas the Night Before Christmas #2

Sheryl’s Churn Dashes, Green & Cream Swap, Alphabet BOM

Hexie Hand Project, L/E Tumblers, ‘Twas the Night Before Christmas #1

Mom’s Sweatshirt, Sister’s Swap Blocks

Just Takes Two, Estate DWR, Compass Lone Star, Candy Sunflower Seeds

QAYG Strings, Postage Stamps, Faux Applique, Blue Strings

Redwork Snowmen, Jane’s Hourglasses, QIAD Flying Dutchmen, Allietare

String HST Wall Hanging, Lee’s Christmas Blocks, Lillbet’s Garden, Star-A-Day

Not to mention a few kit’s I’m considering for this year:

challengekitsTuscan Sun BOM, MayPole Bags(?), The Night Before Christmas

more kits

“Aug 2013 Quilt A”, Triangle Frenzy Runner

squedge 001

Squedge Ruler project – hopefully a 12″ x 30″ table runner

See what other’s are planning for the 2nd quarter over at the Link-up.

2016 Finish A Long – Q1 Proposed Finishes

I nearly missed the announcement.  The 2016 Finish-A-Long has moved – or accurately – expanded. This year there are 9 hosts since there are so many of us participating.

 

Last week I put together my list of proposed finishes for the quarter over on my new “2016 Finish Along” page. The cool thing about this finish along is that you are not penalized for not finishing everything on you list.  So, this year, I’ve picked a few projects that I want to finish this first quarter (2 UFOs & 3 new projects) as my primary goal. Then to cover all the bases, I’ve listed all of my tops that need quilting, all of the projects I’m still piecing, and a few PIGs I’m considering working on this year.

In the past I’ve participated in UFO challenges. Most start off by having you pick 12 UFOs you want to finish, then they are numbered and the host picks a number from 1 – 12 and you work on that UFO for the month. I find that doesn’t work for me, as I may need to work on UFO # 2 for a deadline and the challenge # for the month is # 8. Even when it doesn’t matter what UFO you work on — or when you work on them (do them all in November) I still don’t have success.

Last year I picked 10 UFOs for one challenge – no prompts just bring them in finished by the end of the year. It was my choice if the goal was a completed top or a completed quilt.  There were 5 quilts and 5 tops on my list.  I only finished 1 top and 3 quilts which were on the list, because from the time the list was made (mid-January?) to the end of December I had other quilts pop up that became a priority. The good news is most of them were on my UFO list so the end results is I have fewer UFOs going into 2016 than 2015 which was the ultimate goal.

I’ll link my main page to the Linky, but here are my primary goals for this quarter.

FInishAlongMain

  • Green & Cream Swap
  • Compass Lone Star
  • Shirting Disappearing 9-Patch – this one will be “Blue”
  • Squedge Ruler project – hopefully a 12″ x 30″ table runner
  • Turquoise and Green Strip Twist

Unfortunately the 1st two quilts are on hold until I get my machine out of the shop. I guess it would help if I would get it into the shop. In the meantime, I’ve been cutting up shirts for the Disappearing 9-Patch.