Quilting and Stuff by Knitnoid

Category Archives: Monthly Goals

Review of August 2009 Quilting Goals


Here it is the end of the month. I must say I’m pleased with what I accomplished. I don’t know if I set more realistic goals than I’ve done in the past or simply stayed focused for the most part. Perhaps it was a bit of both.

* At least 2 sets of blocks for the SBS Brown/Blue Swap

The 3rd set was completed 8/9

* Keep up with the SBS BOW

5 blocks turned in for August

* Finish star blocks to go with birthday swap blocks

not only finished the blocks, completed the quilt top 8/22

* Work on Josh’s quilt

completed hand quilting block #10 and started block # 11

* Make up mind about applique on table runner

decided against applique, repaired quilt, made and attached label 8/27

* Work on DWR – top needs to be done by mid-October

attached row of 5 rings, repaired previous work and made more rings

* Make rest of Birthday Swap Blocks

completed them on 8/12 and addressed envelopes for mailing

* Keep scraps cut up

no new scraps added to scrap bucket

* Quilt a baby quilt to get a finish!

This is the one thing I did not get done.

In addition to the above, I finished another baby quilt top (blocks already made) and I completed the shop sample for the Kansas Spirit BOM for my LQS.

Mid-August Update


Here it is mid-August and time for an update on my August goals.

  • At least 2 sets of blocks for the SBS Brown/Blue Swap Done 8/9
  • Keep up with the SBS BOW – 3 blocks done, 2 more to be announced
  • Finish star blocks to go with birthday swap blocks Done 8/7
  • Work on Josh’s quilt – spent 1 night hand quilting
  • Make up mind about applique on table runner – still deciding
  • Work on DWR – top needs to be done by mid-October – got my templates today — Thanks Mark!
  • Make rest of Birthday Swap Blocks (4 more needed) Done 8/12
  • Quilt a baby quilt to get a finish! Replaced with new goal
  • Keep scraps cut up – so far so good

    But what’s that picture of Kansas Troubles fabric doing at the top of this post? Well, this is how my goals change. Although the last block for the Kansas Spirit BOM at Heritage Fine Fabrics won’t be picked up until October, the fabric for the finishing kits need to be ordered now. And in order to know how much fabric to order, I’ve got to write up the instructions. I’ve got the easy part (for me) of the instructions written (setting blocks and triangles) so I now I get to test it. That’s bounced the baby quilt off my list. Oh and did I mention, that once I got the star blocks done, I decided I had to sew them together into a top?

    So for the remainder of the month:

  • Keep up with the SBS BOW
  • Work on Josh’s quilt
  • Make up mind about applique on table runner
  • Work on DWR
  • Finish at least center of birthday swap block quilt (will need to buy border fabric)
  • Finish Kansas Spirit Top and pattern instructions
  • Keep scraps cut up.
  • August 2009 Quilting Goals

    When it comes to quilting, I’m all over the place as far as getting things done. I’ll say I want to finish XYZ, but then I’ll get distracted by something else — and it’s not always new fabric or a new quilt.

    So, I think I’m going to start listing my goals here on my blog, as well as a large printout by my computer, to see if it helps.

    So, in no particular order, here are my August 2009 Quilting Goals

  • At least 2 sets of blocks for the SBS Brown/Blue Swap
    (5 sets are needed by mid-Octber, 1 set is already done)
  • Keep up with the SBS BOW
  • Finish star blocks to go with birthday swap blocks
    (10 done, 10 more needed-block kits already cut)
  • Work on Josh’s quilt
    (5 1/2 blocks to hand quilt, and machine quilt the borders)
  • Make up mind about applique on table runner
  • Work on DWR – top needs to be done by mid-October
  • Make rest of Birthday Swap Blocks (4 more needed)
  • Quilt a baby quilt to get a finish!
  • Keep scraps cut up

  • June’s Goals

    On the QIAD Forum, there is a thread to list your monthly goals. By the time I posted them yesterday, my June goals had already changed. But here they are:

    #1 on the list is still my nephew’s quilt, I’ve got 6 1/2 blocks left to hand quilt and then I’ll machine quilt the border. I don’t know if I’ll get it done by the end of the month or not.

    #2 – a new project. I came home from the quilt shop with fabric for a quilt from 40 Fabulous Quick-Cut Quilts (Fall Frolic). I’m making the quilt smaller 5 x 6 blocks and I’ve used a charm pack and jelly roll. The blocks are made. I’d like to have this quilted and bound by next Friday. We’ll see.

    #3 – Various blocks. I need to make a birthday swap block done, a Kansas Spirit block, and I’d like to make some of the star blocks to go with my birthday blocks.

    #4 – Sashing for Ladder to the Stars.

    #5 – I’ve got to write two sets of setting instructions for the Kansas Spirit quilt — or at least get them far enough along we’ve got a good handle on yardage requirements.

    #6 – Simply because I’m looking for some handwork to take to Music in the Park, Theater in the Park and on our trip at the end of the month, I’ll work on my red work snowmen. I get done what I get done.

    Wow. I’m exhausted just thinking about this. We’ll see how far I get.