Quilting and Stuff by Knitnoid

Category Archives: Kts

November 2009 Quilting Goals

Since I didn’t do so well on last month’s goals, it’s more of the same.

* Keep up with the SBS BOW

* Finish the hand quilting on Josh’s Quilt

* Finish piecing the DWR

* Complete Finishing Instructions for large Kansas Spirit BOM

* Keep Scraps Cut Up

Review of October 2009 Quilting Goals

The month is over, so how did I do? Well, not as good as previous months, but it could have been worse.

* Keep up with the SBS BOW – Done
* Finish the hand quilting on Josh’s Quilt – nope – two thirds of the last block remains
* Finish piecing the DWR – nope – one row is ready to attach and the last row needs putting together
* Hand quilt 2 rings on DWR – obviously not
* Complete Finishing Instructions for both sizes of Kansas Spirit BOM – The smaller quilt instructions have been turned in!
* Machine quilt borders on Josh’s Quilt – obviously not
* Make at least 4 make-up SBS blocks
* Decide on the quilting for Jeremiah’s quilt – didn’t even look at it.
* Work on Ladder to the Star sashings – finished and got the center completed
* Keep Scraps Cut Up – did this, not that there was much to do

I also made a pineapple block to try out a new-to-me technique.

Stash Report Week # 42

The week started off with 1/2 yard inbound from the Kansas Troubles Stash Society and ended with cutting the setting triangles for Ladder to the Stars. In between a sample pineapple block and this week’sSBS BOW. As a result, a bit more fabric went out than came in.

I’ve also pulled 2 1/2″ squares out of my pre-cut box to use as leader/enders, but since these were already cut I don’t think I’ll count them until I put them into blocks.

See how everyone else is doing with their projects over at Patchwork Times.

P.S. I guess I should actually put the #s in the report. Must have gotten distracted by the timmer going off on the microwave.

Fabric Added this Week: .5 yards
Fabric Added to Date: 282.083 yards

Fabric Used this Week: 1.207 yards
Fabric Used to Date: 77.261 yards

Net Stash: +204.822 yards (162.583 was gifted)

10/19 – Added another 1/8 yard to the totals used. Forgot about my extra SBS block I did.

Kansas Troubles Stash Society


Last night was the Kansas Troubles Stash Society meeting at Prairie Point Quilts. There are five of us which generally attend the meeting together, but forces were working such that I’m the only one who made it to the meeting, and then just barely.

I got out of the house in time to run by the library to pick up Part One of Diana Gabaldon’s Voyager and grab a bite to eat at the Sonic across the street before going to the meeting. While I was waiting for my food, I popped in the first disk and started listening to the book. When I got ready to leave, the engine wouldn’t turn over. Apparently, between the cold and leaving the lights while waiting on my food, my old battery couldn’t take it. So, I called my husband to the rescue. We jumped my car off, swapped vehicles, he went home and I got to the meeting about 5 minutes late.

Lots of great quilts using Kansas Troubles fabrics both in KTQ patterns and other patterns. There were two pattern books which caught my eye. Scrap-Basket Surprises by Kim Brackett and Positively Pineapple by Lynda Milligan and Nancy Smith. I’ve looked at Scrap-Basket Surprises a number of times, but I haven’t gotten to the point of purchase. Tonight was no different. I’m not sure what is holding me back, except for my pile of UFOs and more patterns in my personal library than I’ll ever get around to making.

Positively Pineapple came closer. There was a quilt with 2 1/2″ strips and another with 1 1/2″ strips. Neither the book nor ruler came home tonight, but I do have the book on reserve at the library. After I look at it closer we’ll see if it makes the cut the next time I have a bit of book money.

What did come home with me? Just those 4 eighth yard cuts — which were paid for back in January or February.

So tell me, does it count as a new project if I make a sample block, or if I’m using strips from my pre-cut bins?

Stash Report Week # 41

Two weeks in a row with no fabric coming into the house. Tomorrow night is the Kansas Trouble Stash Society meeting so I’ll be in a quilt shop for at least an hour, so there is no telling what will come home with me. At least 1/2 yard of Kansas Trouble fabric.

After Monday’s marathon sewing, I was only able to spend 10 or 15 minutes at a time at the sewing machine. But still I accomplished a bit. Finished another 9 sashings for Ladder to the Stars and added arcs to both sides of 12 melons for the DWR. Saturday I had more time and it all went to the the SBS Block.

Fabric Added this Week: 0 yards
Fabric Added to Date: 281.583 yards

Fabric Used this Week: 1.125 yards
Fabric Used to Date: 76.054 yards

Net Stash: +205.529 yards (162.583 was gifted)

See how others are doing with their stash over at Patchwork Times.

October 2009 Quilting Goals

More of the same this month.

* Keep up with the SBS BOW

* Finish the hand quilting on Josh’s Quilt – needs to be off the frame by 10/15

* Finish piecing the DWR – top needs to be done by 10/15

* Hand quilt 2 rings on DWR

* Complete Finishing Instructions for both sizes of Kansas Spirit BOM

* Machine quilt borders on Josh’s Quilt

* Make at least 4 make-up SBS blocks

* Decide on the quilting for Jeremiah’s quilt

* Work on Ladder to the Star sashings

* Keep Scraps Cut Up

Review of September 2009 Quilting Goals


Another month has gone by, so it’s time to review what I accomplished this month.

* Complete remaining 2 sets of blocks for the SBS Brown/Blue Swap

Finished and in the mail by 9/8

* Keep up with the SBS BOW

It was close, but all blocks were made and turned in on time.

* Work on Josh’s Quilt – needs to be off the frame by 10/15

3 1/2 blocks hand quilted — 1 1/2 blocks to go!

* Work on DWR – top needs to be done by 10/15

12 rings added to the quilt and 6 more are partially pieced

* Complete Finishing Instructions for both sizes of Kansas Spirit BOM

Small quilt needs one more correction. Large quilt about 50% done. (the easy 50%) 🙂

* Quilt a baby quilt

Ran out of time.

* Keep Scraps Cut Up

Well my scraps were cut up, but my friend’s scraps have filled the basket back up!

I also cut the gold fabric for my Ladder to the Stars quilt and I managed to not start anything new. What more can a girl ask for who has more UFOs and Quilt Tops than she can count on her fingers and toes?

Next month will be more of the same. I’ve got my list ready to go.

September 2009 Quilting Goals

Since it appears that listing my quilting goals here and on a large printout by my computer helped, I’m doing it again.

* Complete remaining 2 sets of blocks for the SBS Brown/Blue Swap

G10 – Arizona

L6 – Steps to the Altar

* Keep up with the SBS BOW

* Work on Josh’s Quilt – needs to be off the frame by 10/15

* Work on DWR – top needs to be done by 10/15

* Complete Finishing Instructions for both sizes of Kansas Spirit BOM

* Quilt a baby quilt

* Keep Scraps Cut Up

This is a relatively modest list this month. But I’m itching to start something new and I have several kits so that might happen as well. On the other hand I realized today that I have more quilt tops waiting to be quilted than I do quilts in various stages of progress, so maybe I can talk myself into quilting 2 quilts instead of starting something new.

Review of August 2009 Quilting Goals


Here it is the end of the month. I must say I’m pleased with what I accomplished. I don’t know if I set more realistic goals than I’ve done in the past or simply stayed focused for the most part. Perhaps it was a bit of both.

* At least 2 sets of blocks for the SBS Brown/Blue Swap

The 3rd set was completed 8/9

* Keep up with the SBS BOW

5 blocks turned in for August

* Finish star blocks to go with birthday swap blocks

not only finished the blocks, completed the quilt top 8/22

* Work on Josh’s quilt

completed hand quilting block #10 and started block # 11

* Make up mind about applique on table runner

decided against applique, repaired quilt, made and attached label 8/27

* Work on DWR – top needs to be done by mid-October

attached row of 5 rings, repaired previous work and made more rings

* Make rest of Birthday Swap Blocks

completed them on 8/12 and addressed envelopes for mailing

* Keep scraps cut up

no new scraps added to scrap bucket

* Quilt a baby quilt to get a finish!

This is the one thing I did not get done.

In addition to the above, I finished another baby quilt top (blocks already made) and I completed the shop sample for the Kansas Spirit BOM for my LQS.

Kansas Spirit BOM


Here’s the quilt top I was working on all weekend and which was on my design wall in pieces yesterday. The last border was added to the quilt about 6 this evening which gave me just enough time to do a quick photo session and get to the shop before it closed. (I promise the quilt is ‘square’ and really doesn’t have lumps. It was the flannel behind the quilt and the hangers making it hang weird.)

The pieced blocks are from the book Kansas Spirit, by Jeanne Poore. Connie at Heritage picked out 12 of the 15 blocks to use as a Block of the Month and she choose to use a variety of Kansas Troubles fabrics to use for the blocks. Tomorrow participants are picking up the Courthouse Steps and then there are two more blocks.

This layout is not in the book, but rather one I pulled together. This will be the choice for the smaller of the two quilts (approx. 65 x 83). I’ve got about half of the instructions written for this layout. There will be a larger choice finishing at approximately 89 x 108 which I still have to write. I’ve got it drawn in EQ.