Quilting and Stuff by Knitnoid

Goals for July and the 3rd Qtr Finish Along

3rdQtr

 

Boy do I think I’m dreaming if I expect to FINISH all of these projects by the end of the 3rd Quarter.  Most of these are recycled from earlier in the year and that’s OK because I am getting things done.  So what’s on the 3rd quarter list?

  • Diamond Links – it is partially quilted
  • Easy As Pie – I haven’t touched this in at least a month
  • Double Wedding Ring — just two corners to quilt and then bind
  • Quilt A – this would be a new quilt
  • Quilt C – this is a new quilt as well
  • Yellow Thangles BOM – needs to be quilted
  • Green & Cream Swap – working on it quilt-as-you-go
  • Hardware – a new start
  • Compass Lone Star – a new start
  • String HST – it’s not very big and needs borders and quilting
  • Jared Takes a Wife – I’d love to get this quilted
  • Eeyore – Must get this quilted
  • Scrappy Trips – needs to be quilted
  • Christmas Row Quilt – needs to be quilted
  • Hancock Stars BOM – working on it quilt-as-you-go

There are other quilt tops in pieces that I want to finish this year but don’t necessarily expect to get quilted. Since the list above is for the 3rd Quarter Finish Along over at The Littlest Thistle – I won’t list them unless I really think I can get them finished by the end of the year. As soon as the linky is up I’ll link to it HERE.

JulyGoals

 

So, realistically what do I think I can get done in July?

  • Quilt and finish Eeyore – it’s up first
  • Quilt and finish Scrappy Trips on the treadle
  • Quilt, by hand, one of the two remaining corners of the Double Wedding Ring
  • Finish Candy Sunflower seeds (that’s one of the borders)
  • Make the “R” and the “S” blocks for the Alphabet BOM

To the best of my knowledge I have not forgotten to make any quilts. I do have to finish sewing a hanging sleeve,  but I should be able to knock that out tonight. I might just get everything done this month.

Comments are closed.

Post Navigation