Quilting and Stuff by Knitnoid

July Recap / August Goals

JulyAccomplishments

 

It’s good that I recap what I accomplish each month or I would think I get nothing done.  Much of July was spent working in the yard and or reading.  But then I realize I really did get a few things done.

As part of the yard work, I repainted our windmill. The center of Eeyore was quilted. A set of placemats and coasters was made. I finished quilting the Double Wedding Ring. I made the June BOM block and started on the July block, although I forgot to use muslin as my light. I did some of the embroidery on the next to last block of the Christmas BOM. Not pictured, on the 1st, I finished “the forgotten quilt”.

So, what do I have planned for August?

Goals-August

In no particular order:

  • Finish Eeyore
  • Make the June, July and August blocks (R, S, & T)
  • Attach the binding to the DWR
  • Clean up the sewing room — it’s gotten deep.

There are other things which need to be done as well – labels and pillowcases for at least 5 quilts; get Scrappy Trips done – I still need to make the backing; start the quilt I’m making for a friend’s church auction and possibly quilt, bind and label another quilt for a gift if I can arrange time on the long arm at the end of the month.  And of course this short list doesn’t put a dent in my 2014 Goals which is a just a small subset of my master UFO list.

Comments are closed.

Post Navigation