Quilting and Stuff by Knitnoid

Category Archives: Acrylic Pour

More HSTs

Half Square Triangles in seafoam and lavender are the only thing on my plate for the next couple of weeks. I might squeeze in a block here or there if the BOM instructions come out. These are the pieces for the next 32 Broken Dish units.  Once they are made I’ll assemble the next quarter of the wedding quilt.

Another Easy Breezy block was finished.

In other news this sheet pan and cooling rack arrived today.  I’m playing with acrylic paint pouring and previously only had this silicone mat on the counter to help keep the counter clean.  My hope is I’ll be able to contain the paint drips in the pan and off the counter, as well as be able to easily move drying canvases.  Since it’s a full sheet pan it doesn’t fit in my oven so I don’t have to feel back about getting paint on it.  I am wishing I bought two cooling racks though -one for painting and one for cooking.

  • 350 Challenge = 16
  • Easy Breezy = 93

P.S.  I forgot this post was to be part of Finished (or Not) Friday, so here is where the wedding quilt stands.  1/4 finished plus all those HST above.

40 Day Challenge Day 9

Yesterday my sister came over to quilt a baby quilt, so I had to clear off the quilting machine, again. Although I don’t think I’ll leave the leaf of my sewing table up on a regular basis, it did prove to be a great place to stack the various projects I have going. From the front to the back. On the bottom of the first pile is Allietare. On top of it is the binding fabric, the baby/doll quilt to bind and fabric for the bonus pillowcases. The middle pile is the quit which I need to label and the logcabin quilt. Leaning against the last pile is my Star Studded BOM. The last pile are quilts which need to be washed and photographed. Next to the sewing machine is pair #6 of the pants which need to be hemmed.

I only got one pair of pants hemmed yesterday. I got a bit distracted.

Acrylic Pour videos have been popping up on my Facebook timeline. I saw one by Mixed Media Girl where she used supplies from the Dollar Store  and thought that would be an inexpensive way to try out the technique. This is my first attempt.

Today after I run to Fedex to ship a package, I’m going to do my best to finish the hemming so I can cross it off my list.  I may load the log cabin quilt and while it’s quilting I think I’ll work on the BOM. It would be nice if I had a few more blocks done before I picked up this month’s kit.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.