Quilting and Stuff by Knitnoid

Category Archives: Quilts

Oklahoma Backroads

This evening I finished my Oklahoma Backroads quilt top.  I used Bonnie Hunter’s pattern, but made it smaller.  This top finishes at 64 x 80.

When I started this quilt, I did not intend to have borders.  But the closer I got to finishing it, the more I began to second guess myself.  Three people commented on yesterday’s post about the border and it’s 1 for a small red border and 2 to just bind.  Since I don’t really want the quilt any bigger (although it could be about 5″ longer but don’t tell anyone), I think I will just bind it when it is finally quilted.  The slice of red in the top left corner of the picture is the red fabric I’m planning on using.

What’s On My Design Wall

The Design Floor had Oklahoma Backroads on it for a photo.   It’s in 8 pieces and I’ve got it pinned for the next 4 seams.  Later this week I think I’ll be asking for advice on a border.  Right now I’m leaning toward no border and a red binding — the same red that I used as the cornerstones in my Texas Braid.

On the Design Wall I have 6 blocks from Row A of Sylvia’s Bridal Sampler.  I hope having them up on the wall will encourage me to get the other four blocks from Row A done sooner than later.

See what’s on other design floors, walls, bed, tables by checking out the links over at Patchwork Times.

KVQG BOM – Block 2

The Kaw Valley Quilters Guild meeting is Monday, so this evening I pulled the fabrics and made this month’s block. The BOM is called Jewels in the Crown and it’s by Reeze Hanson of Morning Glory Designs.

99 Pyramids

99 Pyramids. Back in April 2008 I took a class to learn how to use my Wonder Cut Triangle Ruler.  I quickly finished up the front and then pieced together a scrappy backing and binding from the leftover pyramids and green fabric.

At one point I even had this quilt quilted — but the tension was really bad, not to mention the quilting design didn’t work as expected, so I ripped the quilting out.  It wasn’t very hard given the bad tension.  A couple of weekends ago I decided the quilt had aged appropriately (that, and I have a great-nephew on his way sometime this month) and this quilt needed to be quilted.

There’s lots of love pieced and quilted in to this quilt and it will be great for dragging around when the baby gets big enough to drag it.  Most importantly it has no pink in it.  My niece told me she “hates pink!”.  As soon as the baby get’s here I’ll add a label and get it to my niece – not that there’s a big hurry — there’ a heat warning through Thursday.

What’s On My Design Wall

Literally nothing today – except threads. I’ve started sewing the Oklahoma Back Roads blocks together that I showed yesterday.

Check out other design walls by following the links over at Patchwork Times.

Oklahoma Backroads Blocks

Yesterday’s plan was to work on Star Struck. However, in cleaning up the sewing room, I found a stack of blocks that needed to be contained in a project box. I grabbed an unlabeled box and found my Oklahoma Backroads blocks. I finished up the last 20 blocks, so now I’m ready to start sewing them together.

I started working on this quilt as a leader/ender project back in October. It is a Bonnie Hunter pattern that you can find here.

QA Wednesday

Last week’s goals:

#1 – move the Double Wedding Ring from the floor frame to the lap hoop. I don’t know if this will require re-basting or not. I guess I won’t know until I try. – DONE, didn’t rebaste.
#2 – work on Star Struck – Ignored
#3 – since the rest of the house is clean, I now need to work on my sewing room – not much – did get the floor frame taken down.

The DWR didn’t get pulled out of the frame until Monday, which did allow me to take down the floor frame.  Already the sewing room feels bigger.    Part of the delay was I wanted to practice with the new quilt hoop.  I wasn’t able to find my whitework  hand quilting project (it’s here somewhere), so I pulled out my baby 1000 Pyramids.   I quickly realized that was not a good hand quilting project, so I began to quilting to my sewing machine.  I’m just about finished.

So what’s on my list to do this week?

  • Finish quilting and bind the 1000 Pyramids —  I’m going to bind it in the scrappy green binding pictured
  • Every day quilt on my DWR.
  • Clean the sewing room.  I just offered to host my quilting buddies for a sew-in  this month, so this has to get done.

Check out what others are doing by following the links over at Bari’s.

August Quilting Goals

This month I hope to spend more time in my sewing room. I don’t have to work any weekends, so that will help tremendously. My Double Wedding Ring and my Sylvia’s Bridal Sampler quilts have not been touched for months, so I really need to get back to these two quilts. Naturally there are other bits and pieces I’d like to accomplish as well.

  • Keep up with the SBS BOW and the monthly Offline Quilters’ challenges.  This month the goal is 5 blocks on row A.   Who knows what the BOW will bring.  The end result should be 10 more blocks toward the 140.
  • Three 12″ blocks – two are for a swap and one is the KVQG BOM.  I should get the BOM pattern sometime next week.
  • Quilt, Bind and Label the baby 1000 Pyramids – since I’m waiting for the baby to be born, the label might roll to September.
  • Resume quilting on the DWR.  I’ve taken the quilt from the floor frame and put it in the lap hoop.  Last night I worked on it for a while.  I’ll get back to you on how I like the hoop.
  • Finish piecing the Star Struck blocks.  This would be a good project for a sew-in with my quilting buddies.  We haven’t had one of those for a while.
  • Quilt my Texas Braid. Alright, I admit it.  This is my long shot.

Will I finish everything I’ve put out on my list?  Who knows.  Check back with me through the month to see.

What’s On My Design Wall

A couple of years ago I attempted to quilt this on a Little Gracie. The tension was horrible, so I pulled all the quilting out and the quilt has sat waiting to be quilted again. I pulled it out Friday night, thinking I’d try hand quilting it, but decided quickly that with the Warm and Natural batting and all of the seams on the back, that wasn’t a good idea. So, I pulled out my walking foot and started machine quilting it.

I’m just shy of halfway done. I should be able to finish it up this week. And maybe I’ll also get some work done on my Star Struck. It’s still stuck at 18 blocks on the wall.

For more inspiration check out the links at Patchwork Times.

QA Wednesday

From last week’s post:

So this week will be devoted to finding the guest room and if I’m lucky I’ll get to sneak a few minutes of sewing in.

The house is clean – if you don’t look in my sewing room – so now I can sew. Three of the girls arrived last night and then they went to a movie. I took a nap, but did get about 15-20 minutes of piecing done on Star Struck. With 8 more seams, I’ll have another 8 blue stars.

This afternoon I’m off work (and tomorrow too) — originally, I was going to pick up the 4th girl for our Justin Bieber concert party, but my wonderful husband took the three girls and drove up to get her. I think they’ve gone to the mall so I have time to QUILT — or maybe I’ll go take a nap. I’ve been told I get to stay up tonight with the girls after the concert.

So, what’s on the agenda for this week?

#1 – move the Double Wedding Ring from the floor frame to the lap hoop. I don’t know if this will require re-basting or not. I guess I won’t know until I try.
#2 – work on Star Struck
#3 – since the rest of the house is clean, I now need to work on my sewing room

Check out what other’s have planned by following the links over at Bari’s.