Literally nothing today – except threads. I’ve started sewing the Oklahoma Back Roads blocks together that I showed yesterday.
Check out other design walls by following the links over at Patchwork Times.
Literally nothing today – except threads. I’ve started sewing the Oklahoma Back Roads blocks together that I showed yesterday.
Check out other design walls by following the links over at Patchwork Times.
Yesterday’s plan was to work on Star Struck. However, in cleaning up the sewing room, I found a stack of blocks that needed to be contained in a project box. I grabbed an unlabeled box and found my Oklahoma Backroads blocks. I finished up the last 20 blocks, so now I’m ready to start sewing them together.
I started working on this quilt as a leader/ender project back in October. It is a Bonnie Hunter pattern that you can find here.
Last week’s goals:
#1 – move the Double Wedding Ring from the floor frame to the lap hoop. I don’t know if this will require re-basting or not. I guess I won’t know until I try. – DONE, didn’t rebaste.
#2 – work on Star Struck – Ignored
#3 – since the rest of the house is clean, I now need to work on my sewing room – not much – did get the floor frame taken down.
The DWR didn’t get pulled out of the frame until Monday, which did allow me to take down the floor frame. Already the sewing room feels bigger. Part of the delay was I wanted to practice with the new quilt hoop. I wasn’t able to find my whitework hand quilting project (it’s here somewhere), so I pulled out my baby 1000 Pyramids. I quickly realized that was not a good hand quilting project, so I began to quilting to my sewing machine. I’m just about finished.
So what’s on my list to do this week?
Check out what others are doing by following the links over at Bari’s.
This month I hope to spend more time in my sewing room. I don’t have to work any weekends, so that will help tremendously. My Double Wedding Ring and my Sylvia’s Bridal Sampler quilts have not been touched for months, so I really need to get back to these two quilts. Naturally there are other bits and pieces I’d like to accomplish as well.
Will I finish everything I’ve put out on my list? Who knows. Check back with me through the month to see.
A couple of years ago I attempted to quilt this on a Little Gracie. The tension was horrible, so I pulled all the quilting out and the quilt has sat waiting to be quilted again. I pulled it out Friday night, thinking I’d try hand quilting it, but decided quickly that with the Warm and Natural batting and all of the seams on the back, that wasn’t a good idea. So, I pulled out my walking foot and started machine quilting it.
I’m just shy of halfway done. I should be able to finish it up this week. And maybe I’ll also get some work done on my Star Struck. It’s still stuck at 18 blocks on the wall.
For more inspiration check out the links at Patchwork Times.
From last week’s post:
So this week will be devoted to finding the guest room and if I’m lucky I’ll get to sneak a few minutes of sewing in.
The house is clean – if you don’t look in my sewing room – so now I can sew. Three of the girls arrived last night and then they went to a movie. I took a nap, but did get about 15-20 minutes of piecing done on Star Struck. With 8 more seams, I’ll have another 8 blue stars.
This afternoon I’m off work (and tomorrow too) — originally, I was going to pick up the 4th girl for our Justin Bieber concert party, but my wonderful husband took the three girls and drove up to get her. I think they’ve gone to the mall so I have time to QUILT — or maybe I’ll go take a nap. I’ve been told I get to stay up tonight with the girls after the concert.
So, what’s on the agenda for this week?
#1 – move the Double Wedding Ring from the floor frame to the lap hoop. I don’t know if this will require re-basting or not. I guess I won’t know until I try.
#2 – work on Star Struck
#3 – since the rest of the house is clean, I now need to work on my sewing room
Check out what other’s have planned by following the links over at Bari’s.
Is anyone surprised that Star Struck is still on the wall? We’ve been cleaning and working in the yard, so no quilting has been done since about Tuesday. Although only two new blocks have been added, I now have the gold sewn to all of the blue units. They are also paired up so I can quickly sew together units to make 1/2 blocks — whenever I get back to the sewing machine.
Check out what other’s have on their wall’s by following the links over at Judy’s.
It’s been a busy week, not that I could tell you what I’ve done all week. But it was very little quilting after about Monday or Tuesday. Early this week I finished cutting the gold accent pieces for Star Struck. Nothing inbound quilting related except for the quilting hoop and book. Oh, yes, I picked up the current issue of Country Woman last night at Jo-Ann’s. There is an article about Jennifer Chiaverini and I think a quilt pattern in it. We were in Jo-Ann’s to pick up a piece of upholstery fabric to cover the seat of a small loveseat. That’s what I’ll be doing today.
So here’s the tally:
Fabric Added this Week: 0 yards
Fabric Added to Date: 132.011 yards
Fabric Used this Week: .7 yards
Fabric Used to Date: 56.606 yards
Net Stash for 2010: 75.405 yards
Check out how others are doing over with their Stash Busting efforts over at Patchwork Times.
Yes, Star Struck is still on my design wall. But I have done more piecing on it.
When I get these pieces sew together I’ll have completed 40 blocks. I’m aiming for 80, so I still have a way to go.
check out other design walls following the links over at PatchworkTimes.
There were only two things on my list last week.
I’d show a picture of the room as it is this week, but it’s hard to see the changes. You’ll just have to believe me when I’ve said I’ve made progress. What can I say – I got distracted – but it was a good distraction.
I’ve finally finished the baby quilt! A baby girl quilt has been on my list since at least May. I promise I was cleaning my sewing room, when I got the urge to get this top quilted. I think it might have been receiving an invitation to a baby shower where I need a “boy” quilt. I couldn’t very well skip ahead to that quilt when this quilt is going to a baby who is now 2 1/2 months old. It also helped that I was able to pull a piece of batting out of my batting box that was the correct size 🙂
Here’s a closeup of the quilting. Nothing fancy – diagonal lines through the green, resulting in a X on the white squares and a curvy 1/4″-ish on the petals. I used a light pink thread.
The backing is the pretty green floral I bought at the end of May on a shop hop. The binding and label is a pink Marble I had in my stash.
So what’s up for this coming week?
See what others are planning by following the links over at Bari’s.