Quilting and Stuff by Knitnoid

What’s On My Design Wall

dw0907

 

Having bound the first Disappearing 9-Patch, I’m now working on the backing for the pink and floral Aiming for Accuracy quilt top. I pulled all the pink, purple and floral blocks from my Orphan Quilt Box as a start. I’ve got a whole pile of pink and white bounce HST from an earlier quit and those are going to get made into pinwheels and added to the mix.  Finally I’m going to use this pink and purple butterfly fabric to fill in the gaps.

butterflies

 

Blocks will be rearranged before I’m done.

See what others are working on over at Patchwork Times.

Stash Report

gracedavid

This past week I actually finished stuff to the point I can count it!  Two backings – one for the quilt pictured above and another shirt backing for one of the other Disappearing 9-patches. Normally I don’t count backings until the quilt is quilted, but given that this back is pieced and it could be a quilt on it’s own, I’ve counted it now. There is binding and the label to count for the Orange Disappearing 9-patch as well. As you can see, Gracie approves.

Fabric Added Since Last Report 0.0 yards
Fabric Added to Date: 185.805 yards

Fabric Used Since Last Report: 11.693 yards
Fabric Used to Date: 73.476 yards

INCREASE in Stash to Date:  112.327 yards

See how others are doing over at Patchwork Times.

UFO Busting Report

It’s time to report on my UFO Busting progress. No finishes in August — but progress was made. I completed one quilt top and two pieced backings. I’ve started quilting one of the Disappearing 9-patches and have identified a dozen quilts that I want/need to finish by the end of the year.

  • Projects In Process August 1 – 63
  • Projects Completed – 0
  • New Projects started – 0
  • UFOs re-purposed – 0
  • Projects in Process August 31 – 63

See how others are doing by following the links over at Field Trips in Fiber.

The Quilting Has Begun

orangedp9quiltingbegin

Backing #2 Is Complete

quiltback2

Two more shirting backings to go.

September Goals

shirts

For September I would like to get these four shirting quilts quilted. But before I can do that I need to finish piecing 3 backings. I hope, given that I have two 4 day weekends this month, I can pull this off. If I get it all done, there is more to do as the quilts pictured below are on my list to finish by the end of the year as well.

therestofthequilts

I did mention I set a crazy challenge for myself, didn’t I?

What’s On My Design Wall

orangedp9back

 

Over the weekend I finished cutting the shirt squares. Then I started stitching them into quilt backs. The one pictured above will go with the Orange Disappearing 9-Patch. Pictured below is half of the backing for one of the other Disappearing 9-Patch quilts.

120half-2

In the bottom left corner is the stack of quilt tops which I’m planning on quilting. I hope to get all of these backs knocked out this week, then I’ll start a marathon quilting session. I’ve got a 4-day weekend coming up.

Hop over to Patchwork Times to see what others are working on.

Stash Report

stash0830

It was a long day Saturday — I finished cutting the rest of the squares for the quilt backs — and the first 80 are sewn into groups of 4. But I simply ran out of steam before I could finish the back, so no fabric counted as out this week.

Fabric Added Since Last Report 0.0 yards
Fabric Added to Date: 185.805 yards

Fabric Used Since Last Report: 0.0 yards
Fabric Used to Date: 61.785 yards

INCREASE in Stash to Date:  124.02 yards

See how others are doing over at Patchwork Times.

Past the Halfway Point

backing-229

229 squares cut, another 181 squares to go to hit 410. I’ve emptied one shirt box, although I am filling it up with bits and pieces which need to be cut up into the Scrap Users System. But that’s for another day perhaps in January after I get past my latest crazy challenge of finishing 12 quilts in 4 months.

I had high hopes for this week.  Get all the squares cut and the smallest backing made so I could quilt the Orange Disappearing 9-patch next week.  However, I had a vicious attack of hives and it knocked me for a loop for a couple of days. I don’t ever recall having hives before and have no idea what set them off. Tomorrow is another day, so perhaps I’ll get more knocked out then than I have the last couple of days.

 

What’s On My Design Wall

dw0824

I’ve been cutting up my shirts into 9-inch squares to make the backings for 4 quilts made from shirts. So far I’ve cut 183 squares and I need 410 for the 4 backings. The count should have been 187, but I cut the last shirt back wrong, not once, but twice, resulting in just 2 squares instead of 6. At that point I called it a day.

That pile of strips in the back will eventually become tumblers.

Check out the links over at Patchwork Times to see what others are working on.