Quilting and Stuff by Knitnoid

Category Archives: 40 Days – 2020

40 Day Challenge – Day 30

Ten days left in my 40 Day Challenge and I probably should have put the binding on the baby 4-Patch Stacked Posy quilt then the only thing left would be Frolic. Perhaps I’ll do that tomorrow. Today, I finished 8 more blocks to Frolic. You’ll notice there are a few smaller blocks on the wall.  Those are the first blocks from the 2020-2021 Quiltville Leader/Ender Project – Easy Breezy.

Bonnie posted 2 different sizes and I’ve opted for the smaller 4 -1/2 inch blocks. The first two blocks I made as she showed, but given one block was getting made as I finished each Frolic block and I don’t have many pieces cut, I’m now only sewing one piece at the end of each line of stitching. I think I have 3 more blocks cut, so I’ll need to cut more blocks before I finish the rest of the Frolic blocks.

Tomorrow I hope to  finish the rest of the Frolic blocks, and at least determine what I  need to cut for the setting triangles.  Or maybe I will put the binding on the quilt. Here’s what’s left:

  • Bind Baby 4-Patch Stacked Posies
  • The blue, black and white quilt is my Frolic the goal is to finish the top. Started with 5 blocks I need 41, 16 side setting triangles. 4 corners and the pieced borders for my enlarged quilt.
    • 3 blocks 6/26/2020
    • 3 blocks 6/27/2020
    • 6 blocks 6/28/2020
    • 3 blocks 6/29/2020
    • 5 blocks 6/30/2020
    • 8 blocks 7/2/2020
  • Bonus #1 – Pillowcases:
    • Allietare
    • Narragansett Blues
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • En Provence (2)
    • Carolina Chain
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 28 & 29

June 30th & July 1st were very busy at work.  I was on the phone non-stop from the time I got to my desk (2 hrs early yesterday) until I was finally able to step away (2 hrs late yesterday). Yes, July 1st was a 13 hour day as I did not get a break for lunch.  Needless to say I got very little done on the quilting front.

Wednesday I did determine what I needed to complete my extra 16 blocks.  I have “kits” which were cut and pieced to a point for the side triangles which I am going to use for my blocks.  I had to cut more neutral squares and will need more black & blue 4-patches. Yesterday I determined how many more  I’ll need for the rest of the quilt and started cutting my strips. when I cut 2 strips for the 4-patches from the same fabric instead of a wide strip for the geese, I decided I was too tired to continue and set my cutter down.  I was asleep by 8:30.

This picture was taken this morning (Friday). Today I plan to get the 4-patches done and start sewing the remaining blocks together. I was up early again because I went to bed so early, so perhaps a mid-day nap will get me back on track.  Waking up at 5 AM is just too early for me.

 

40 Day Challenge – Day 27

If I was making Frolic as written it would be time to move on to the setting triangles.  Instead, I’ve cut neutral squares to add to the setting triangle kits and have counted the number of 4-patches I need to make to make more blocks. Eventually I’ll need to cut more fabric for the setting triangles, but I’ll worry about that another day. The blocks are not in their final location. But if you see any turned pieces, please let me know.

Today I also decided on the fabric combination for my Allietare pillowcase. Perhaps tomorrow I’ll make it – or at least get the fabric cut so I can put it away.

This is what’s left on my list. With the 3 day holiday, I might just get the list completed in the next 13 days.

  • Bind Baby 4-Patch Stacked Posies
  • The blue, black and white quilt is my Frolic the goal is to finish the top. Started with 5 blocks I need 41, 16 side setting triangles. 4 corners and the pieced borders for my enlarged quilt.
    • 3 blocks 6/26/2020
    • 3 blocks 6/27/2020
    • 6 blocks 6/28/2020
    • 3 blocks 6/29/2020
    • 5 blocks 6/30/2020
  • Bonus #1 – Pillowcases:
    • Allietare
    • Narragansett Blues
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • En Provence (2)
    • Carolina Chain
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

 

40 Day Challenge – Day 26

 

Given the number of items I’ve crossed off the Challenge List as done, I thought I’d take a break today.  But given the choice between cleaning my living room or sewing,  I opted to piece a few more blocks after taking a nap.  I got three done, then on the 4th, I turned a unit. At that point I decided to call it a night.

Here’s what’s left:

  • Bind Baby 4-Patch Stacked Posies
  • The blue, black and white quilt is my Frolic the goal is to finish the top. Started with 5 blocks I need 41, 16 side setting triangles. 4 corners and the pieced borders for my enlarged quilt.
    • 3 blocks 6/26/2020
    • 3 blocks 6/27/2020
    • 6 blocks 6/28/2020
    • 3 blocks 6/29/2020
  • Bonus #1 – Pillowcases:
    • Allietare
    • Narragansett Blues
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • En Provence (2)
    • Carolina Chain
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 25

 

Alleitare is finished!  This was the 2015 Quiltville Mystery Quilt designed by Bonnie Hunter.  I finally got the border on it a few years ago at a quilt retreat and got it quilted before I went to Shipshewana 2 years ago. It sat in the To Be Bound stack because I didn’t know if I could do both a scalloped border and use Susie’s Magic Binding.  This afternoon I decided to just go for it.

Other tasks today included making another 6 Frolic blocks and delivering the quilt that needed the label.  Since I plan to make Frolic one block wider and longer 41 blocks and 16 side setting triangles. I now have 17 blocks completed. There will be more cutting of fabric before the top is completed.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding. 6/28/2020
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered. 6/28/2020
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled. – 6/24/2020
  • The blue, black and white quilt is my Frolic the goal is to finish the top. Started with 5.
    • 3 blocks 6/26/2020
    • 3 blocks 6/27/2020
    • 6 blocks 6/28/2020
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2) 6/25/2020
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 24

This is how Day 24 started off.  When I pressed the last seem  I saw what I thought was one HST turned.  Then I realized the ‘turned’ one was correct. Then I realized the flying geese on the left are turned wrong. My solution? Mark the block and keep going.  After quilting “all day” I have 3 blocks done.

This is the log cabin quilt my sister and i made for my niece and her new husband.  They received it today so now I can show it. A more in-depth report  in a few weeks.

 

 

I did get one other thing done.  The label for the quilt that I’m delivering tomorrow.  I had lost the piece of paper that I had the original piecer’s name written on and decided to make a label anyway.  I have a small bag with a few more pieces and my sister asked if the paper was in the bag. I told her no, but said I’d look anyway only to discover the quilter’s name on the back of envelope. It turns out I had her name all along, but didn’t realize it.

 

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered. Label sewn 6/27/2020
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled. – 6/24/2020
  • The blue, black and white quilt is my Frolic the goal is to finish the top. Started with 5.
    • 3 blocks 6/26/2020
    • 3 blocks 6/27/2020
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2) 6/25/2020
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 23

Today’s big project was hanging quilts to photograph.  These are the 3 quilts I made from the Sisters’s Swap back in 2005. Binding the 3rd one was part of this challenge. After the challenge is over, I’ll do an in-depth post on these quilts.

This weekend I’m sewing in the living room as my sister has the long arm going and there really isn’t enough room for two to sew in there. I was late getting started, but I managed to get 3 of my Frolic blocks completed. That brings the # to 9.  Since I plan to enlarge the quilt, I’m not sure how many I need to make.  Perhaps I’ll figure that out over the weekend.

 

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled. – 6/24/2020
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2) 6/25/2020
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 22

Today I made 2 pillowcases.  I only have a picture of one and they are in the dryer along with the quilt.

Since my sister has arrived for the weekend, I’m in the process of setting up a sewing area in my living room. I need to track down a power strip and then I’ll be good to go.  On tap for this weekend is Frolic. I’d love to have all of my blocks completed before the weekend is over.

 

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled. – 6/24/2020
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2) 6/25/2020
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 21

Part 2 of the reason behind the 40 Day Challenge is done!  I need to make a couple of pillowcases then it goes into the wash.  Although I’ll take pictures this weekend it will be next month before it’s shown in all it’s glory. Even the label is stitched down.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled. – 6/24/2020
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – The Halfway Point

Yes, Tuesday marked the 1/2 way point in my self-imposed 40 day challenge.

Here’s a recap.

  1. Bind the table runner, Narragansett Blues, and a customer quilt. Bonus pillowcase.
  2. Catch up on Star Studded BOM (still need to do the June block), bind Sister Swap # 3 and Then & Now.
  3. Bonus pillow case for On Ringo Lake, quilt Log Cabin quilt,  Good Fortune bonus pillowcase
  4. Not pictured – Hem 8 pair of pants with cuffs for my niece’s wedding next month.

 

I still need to bind the log cabin quilt. Sewing the binding strips together was today’s progress, and I hope to have the quilt finished before the end of the week.  This weekend my sister is coming over to use both the long arm and my sewing machine to attach binding to quilts, so I’ll be using my Genie to resume piecing Frolic. Then next week, I’ll see about binding Allietare.

Looking at what is left on my list, I’m pretty sure I can meet all of my goals, with the possible exception of the Frolic top.  But if I miss it, it shouldn’t be by much. Then it will be on to the next challenge — which I’m already thinking about.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.