Quilting and Stuff by Knitnoid

Category Archives: Then And Now

40 Day Challenge – The Halfway Point

Yes, Tuesday marked the 1/2 way point in my self-imposed 40 day challenge.

Here’s a recap.

  1. Bind the table runner, Narragansett Blues, and a customer quilt. Bonus pillowcase.
  2. Catch up on Star Studded BOM (still need to do the June block), bind Sister Swap # 3 and Then & Now.
  3. Bonus pillow case for On Ringo Lake, quilt Log Cabin quilt,  Good Fortune bonus pillowcase
  4. Not pictured – Hem 8 pair of pants with cuffs for my niece’s wedding next month.

 

I still need to bind the log cabin quilt. Sewing the binding strips together was today’s progress, and I hope to have the quilt finished before the end of the week.  This weekend my sister is coming over to use both the long arm and my sewing machine to attach binding to quilts, so I’ll be using my Genie to resume piecing Frolic. Then next week, I’ll see about binding Allietare.

Looking at what is left on my list, I’m pretty sure I can meet all of my goals, with the possible exception of the Frolic top.  But if I miss it, it shouldn’t be by much. Then it will be on to the next challenge — which I’m already thinking about.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 4

This afternoon I bound this table runner. I made it to test a pattern I wrote, pulling fabric from my stash.  The fabrics didn’t work as well as I hoped, so it sat for 7 years before I quilted it.  Then it sat in the to be bound pile for 7 months until I found fabric to bind it with. Because I’m lazy I used Susie’s Magic Binding. I have to say that pop of dark green sets if off and now I think the fabrics work.  Or maybe it’s just because it’s finished.

Next up was the first pair of pants to be hemmed. When I realized I was going to have to CUT the pants, I wanted confirmation of the length. It’s a good thing I asked. My niece realized there have been some substitutions since she gave me the pants back in February/March and needed to double check the sizes/length. Someone must be taller as there is one pair I don’t have to hem.

While I was wait to hear from my niece, I started looking for fabric to bind Now and Later, which I’ve been calling Then and Now.  Well, actually I started to look for fabric to bind Narragansett Blues, but I realized I either used the fabric, or never had any to begin with. Since I’m not ready to tackle the binding for Allietare, Now and Later moved to the top.

I’m not sure what I planned to bind this quilt with – possibly blue given I quilted it with blue, but I like the green and yellow.

That leaves the following:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge

I’d like to get back to blogging about my quilting. It seems that I generally just post to Facebook anymore.  In one of my Facebook groups someone asked “What are you working on?” For me this morphed into this 40 Day challenge. My goal is to get everything on this list done.

This first picture is a stack of quilts that need to be bound.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down
  • Then & Now
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use

Believe it or not there’s more work in this pile than the binding pile.

The quilt with the striped backing needs a label and delivered

I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.

The log cabin quilt needs to be quilted bound and labeled.

The blue, black and white quilt is my Frolic the goal is to finish the top.

Although not quilting, there are 9 pair of pants which need to be shortened. This is driving the 40 days.

Bonus #1: Pillowcases for the customer quilt, Allietaire, Narragansett Blues, and the log cabin quilt (2)

Bonus #2: Pillowcases for quilts already completed – Christmas Crazy 8s, On Ringo Lake, En Provence (2), Carolina Chain, Good Fortune

Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

It should be an interesting 40 -45 days.