Quilting and Stuff by Knitnoid

Category Archives: Stash Busting Report

Stash Report Week # 50


This week I didn’t sit at my sewing machine very much. I find that after a finish, whether it’s a complete quilt, or a top, I tend to need a break. It’s not that I don’t have plenty on my list that I want to do – like finish the last few seams on DWR – but that it ends up becoming a chore and quilting is supposed to be fun. So once I finished the Autumn Splendor top on Monday, I read a couple of Lynn Kurland’s books.

Sometime this week I pulled out my music fabrics and started thinking about the back of the Music Star quilt top. Naturally the back is going to music as well. After all I conservatively STILL have 40 yards of music fabric. I based my calculation on the 156 unique fabrics in the quilt top — I had to buy at least a FQ and frequently bought more. However it’s probably closer to 90 yards since the music fabric is stored in 2 drawers about the size of my fabric boxes and they are stuffed. My fabric boxes can hold 45 yards of fabric. Of course since I made the top, I’ve bought or was given a few more FQs and I didn’t use every fabric I had in the top.

Anyway, I’m making the back ala’ Bonnie Hunter (scroll to the bottom of the page). So Friday after dinner with the girls, I started cutting 10 1/2″ squares, one from each piece of music fabric. I’ve got a few pieces which won’t work as 10 1/2″ squares such as this border print called Marching Band (It’s Pattern # 2923 from Andover Fabrics and was designed by Gail Kessler).


I love this print, and searched the Kansas City area for it when it came out. That was the year of the Iowa Road Trip (13 stores in 3 days). I found it on our last day at Quilting Connection in Ames, Iowa. I bought 1 yard of it then. I’ve since bought a 2 yard piece mail order. Other than going into the Music Quilt I didn’t know how I was going to use it. I cut one strip that didn’t quite finish at 10 x 40 so I pieced a couple of squares to make it work. (Any ideas for how to use the rest of the fabric?)

This panel is another pieces that didn’t fit.


I’m adding a couple of fabrics not already used in the back to it to make it finish at 20 x 30.

When it’s all said and done, I’ll need the equivalent of 99 10 1/2″ squares. I managed to get 91 cut Friday and Saturday.

So if you’ve made it this far, here is my stash report for the week.

Fabric Added this Week: .25 yards
Fabric Added to Date: 282.583 yards

Fabric Used this Week: 9 yards
Fabric Used to Date: 105.426 yards

Net Stash: +177.157 yards

See how everyone else is doing with their stash over at Judy’s blog at Patchwork Times.

P.S. That Snowflake FQ is for the Guild Christmas Party tomorrow. It’s the first thing I’ve bought in 5 weeks.

Stash Report Week # 49

This week I cut the fabric for Part 2 of Carolina Christmas. No other fabric out and no fabric in. That makes it 5 weeks since I brought any fabric into the house. I might just hit 100 yards out before the end of the year.

Fabric Added this Week: 0 yards
Fabric Added to Date: 282.333 yards

Fabric Used this Week: 3 yards
Fabric Used to Date: 96.426 yards

Net Stash: +185.907 yards

Check out how everyone else is doing over at Patchwork Times.

Stash Report Week # 48

My big plans were to get the borders on two quilts this week, but I only managed to get the first border cut and partially put on Autumn Splendor before starting Carolina Christmas. Hum…I wonder if this has anything to do with why I have so many UFOs?

Fabric Added this Week: 0 yards
Fabric Added to Date: 282.333 yards

Fabric Used this Week: 3.04 yards
Fabric Used to Date: 93.426 yards

Net Stash: +188.907 yards

Check out how others are doing with their stash busting efforts over at Patchwork Times.

Stash Report Week # 47

No fabric in. No fabric out.

But with two days off this week, I hope I’ll get to the borders for both Autumn Splendor and Ladder to the Stars. That will bring me in striking distance of 100 yards. We’ll just have to wait and see what the week brings.

Fabric Added this Week: 0 yards
Fabric Added to Date: 282.333 yards

Fabric Used this Week: 0 yards
Fabric Used to Date: 90.386 yards

Net Stash: +191.947 yards

See if anyone else is getting close to their goal over at Patchwork Times.

Stash Report Week # 46

I’ve completely ignored my Sylvia’s Bridal Sampler blocks so far this month. Maybe over Thanksgiving weekend I’ll get all 5 of them done for the month. It will only add up to about 5/8 yard, but every inch counts.

The binding is going on the graduation quilt! I made it last night, so 5/8 yards out.


This past year I’ve reached for that fabric on more than one occasion to use it for something — the last time I stapled a note to the selvage so I wouldn’t use it and then wonder what happened to the binding fabric for Josh’s quilt.


The note is now off the fabric and the remaining 7/8 yards is in the “blue” bin so I can use it for something else.

Fabric Added this Week: 0 yards
Fabric Added to Date: 282.333 yards

Fabric Used this Week: .625 yards
Fabric Used to Date: 90.386 yards

Net Stash: +191.947 yards

See how others are doing on their stash busting effort by checking out the links on Judy’s blog Patchwork Times.

Stash Report Week # 45

It was a rather productive week. The last row on the DWR was attached, which allowed me to determine what I needed in the way of backing and batting. The backing was found in my stash — so that’s 9 yards out. Woohoo! I also finished the hand quilting on my nephew’s quilt. I have one border machine quilted and have the second one partially marked. Finally, I cut into a kit I put together a little over a year ago and have half the blocks made — 20 FQ = 3 yards. So 12 yards out and I’m back under 200 yards inbound.

If I push, I might just make 100 yards used by the end of the year — borders for a couple of quilts, binding for Josh’s quilt, backing & binding for the music quilt and perhaps a dozen SBS blocks.

Fabric Added this Week: 0 yards
Fabric Added to Date: 282.333 yards

Fabric Used this Week: 12 yards
Fabric Used to Date: 89.761 yards

Net Stash: +192.572 yards

See how others are doing on their stash busting effort by checking out the links on Judy’s blog Patchwork Times.

Stash Report Week # 44

This week was a wash. A couple of SBS blocks (although not the one due tonight) were completed and one FQ inbound.

Instead of quilting Saturday, my DH and I drove down to Independence, Kansas for the Neewollah Festival, specifically the Marching Band Festival. We heard some great music. The day was absolutely perfect for the drive and festival. It cooled off after the sun went down, but I had my trusty picnic quillow with me. It was a great seat cushion until I needed it to keep warm.


So here’s the report

Fabric Added this Week: .25 yards
Fabric Added to Date: 282.333 yards

Fabric Used this Week: .25 yards
Fabric Used to Date: 77.761 yards

Net Stash: +204.572 yards

See how others are doing over at Patchwork Times.

Stash Report Week # 43

Last week was mostly piecing what I already had cut. So just a little bit out — enough for my SBS BOW and the rest of the cornerstones I need to complete the row of rings I’m working on for my DWR.

Even though I saw some great fabrics as the show yesterday, I didn’t buy any. I even walked away from music FQs that I had not seen before!

Fabric Added this Week: 0 yards
Fabric Added to Date: 282.083 yards

Fabric Used this Week: .25 yards
Fabric Used to Date: 77.511 yards

Net Stash: +204.572 yards (162.583 was received as gifts)

See how others are doing by following the links over at Patchwork Times.

Stash Report Week # 42

The week started off with 1/2 yard inbound from the Kansas Troubles Stash Society and ended with cutting the setting triangles for Ladder to the Stars. In between a sample pineapple block and this week’sSBS BOW. As a result, a bit more fabric went out than came in.

I’ve also pulled 2 1/2″ squares out of my pre-cut box to use as leader/enders, but since these were already cut I don’t think I’ll count them until I put them into blocks.

See how everyone else is doing with their projects over at Patchwork Times.

P.S. I guess I should actually put the #s in the report. Must have gotten distracted by the timmer going off on the microwave.

Fabric Added this Week: .5 yards
Fabric Added to Date: 282.083 yards

Fabric Used this Week: 1.207 yards
Fabric Used to Date: 77.261 yards

Net Stash: +204.822 yards (162.583 was gifted)

10/19 – Added another 1/8 yard to the totals used. Forgot about my extra SBS block I did.

Stash Report Week # 41

Two weeks in a row with no fabric coming into the house. Tomorrow night is the Kansas Trouble Stash Society meeting so I’ll be in a quilt shop for at least an hour, so there is no telling what will come home with me. At least 1/2 yard of Kansas Trouble fabric.

After Monday’s marathon sewing, I was only able to spend 10 or 15 minutes at a time at the sewing machine. But still I accomplished a bit. Finished another 9 sashings for Ladder to the Stars and added arcs to both sides of 12 melons for the DWR. Saturday I had more time and it all went to the the SBS Block.

Fabric Added this Week: 0 yards
Fabric Added to Date: 281.583 yards

Fabric Used this Week: 1.125 yards
Fabric Used to Date: 76.054 yards

Net Stash: +205.529 yards (162.583 was gifted)

See how others are doing with their stash over at Patchwork Times.