Quilting and Stuff by Knitnoid

The First Few Days of 2026

I’ve spent the first few days of 2026 in the Quilt Studio.  Just poking about and making forward progress.  The sewing table is cleared off (well was until I pulled Twirling Leaves out), half the pressing station is cleared, the long arm is cleared (or was until I got back from the laundry mat), and the piles on the other two tables are lower. I’ve also identified 12 projects I want to complete in 2026.  A description of the projects and their current state can be seen HERE.

I pulled Twirling Leaves out and assembled the first two sections.  I still need to do the turn back on the last section before assembling and attaching it, then adding the borders.  This is my # 1 project as I’m sending it out to be custom quilted and I have a slot on the longarmers calendar in early March.

I mentioned going to the laundry mat.  My two oversize king quilts needed washing. They just don’t fit in my washing machine and dryer.  One hour and $18.50 later, the 2 quilts, as well as 2 table runners and a knitted afghan are clean. While I sat there I ripped apart the green and orange Chain of Blossoms so I can put in sashing and cornerstones.

When I got home, I dug through my backing box and found a piece of fabric big enough to make a backing for the red, white & blue Chain of Blossoms.

Brandon Quilters meets tonight, so I’ll probably only get the long arm cleared off again.

Leave a Reply

Your email address will not be published. Required fields are marked *

Post Navigation