Yes, Tuesday marked the 1/2 way point in my self-imposed 40 day challenge.

Here’s a recap.

  1. Bind the table runner, Narragansett Blues, and a customer quilt. Bonus pillowcase.
  2. Catch up on Star Studded BOM (still need to do the June block), bind Sister Swap # 3 and Then & Now.
  3. Bonus pillow case for On Ringo Lake, quilt Log Cabin quilt,  Good Fortune bonus pillowcase
  4. Not pictured – Hem 8 pair of pants with cuffs for my niece’s wedding next month.

 

I still need to bind the log cabin quilt. Sewing the binding strips together was today’s progress, and I hope to have the quilt finished before the end of the week.  This weekend my sister is coming over to use both the long arm and my sewing machine to attach binding to quilts, so I’ll be using my Genie to resume piecing Frolic. Then next week, I’ll see about binding Allietare.

Looking at what is left on my list, I’m pretty sure I can meet all of my goals, with the possible exception of the Frolic top.  But if I miss it, it shouldn’t be by much. Then it will be on to the next challenge — which I’m already thinking about.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues 6/11/2020
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 7 12-inch blocks and 23 6-inch blocks as of 6/12/2020
    • 5 6-inch blocks made 6/13/2020
    • 2 12-inch blocks made 6/14/2020
    • 6 6-inch blocks made on 6/16/2020
    • 12 6-inch blocks made on 6/20/2020
    • 2 12-inch blocks made on 6/21/2020
    • 3 12-inch blocks made on 6/22/2020
  • The log cabin quilt needs to be quilted, bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
    • 2 pair hemmed 6/9/2020
    • 1 pair hemmed 6/12/2020
    • 3 pair hemmed 6/13/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietare
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake 6/16/2020
    • En Provence (2)
    • Carolina Chain
    • Good Fortune 6/16/2020
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

Comments are closed.