Quilting and Stuff by Knitnoid

Category Archives: Challenges

Quilting Design Dilema

Sunday afternoon I pieced the back for the Red, White, & Blue Wonky Dishes quilt.  Yes, when it comes to plaids, they must match.  That goes way back to my garment sewing days.  That was the easy part.

The quilt is loaded. but now I have to figure out the quilting design.  I want to use this quilt to practice the quilting for the wedding quilt.

About the only thing I know is that I want the quilting to enhance the ‘rings’.  I’m just struggling with what the motif to use.  I guess I need to pull out a big white board and start doodling until I figure something out. This quilt is on my 2021 Personal Challenge #1 list and is the quilt I want to show at the Guild meeting later this month.

 

Design Wall Monday – 2/1/21

It’s Monday and the 1st of the month, so there’s lots to link up.

If you’ve been following my posts in January, you may be thinking to yourself “Haven’t I seen this before?”.  But I promise, this is a new picture for Design Wall Monday.

I spent the weekend working on my Guild’s website and only got in a bit of quilting.  This is all of the pieces for the rest of the wedding quilt.  The lavender broken dishes are made, and have the seafoam HST ready to stitch.

Ideally, yesterday’s post should have been my accomplishment post to One Monthly Goal over at Elm Street Quilts. I really had hoped I’d have this top finished. It’s still in many pieces. But this is where I am now:

The pieces above

Half the quilt from earlier in the month.

And 1/4 of the top from early last week.  Perhaps by this Friday.

So, what is my One Monthly Goal for February?  I could say finish the wedding top, since I’m confident it will get finished, but instead I’m going with Quilt the Red, White & Blue Wonky Dishes.

I want to work out my quilting ideas on this quilt before I quilt the wedding quilt.

Which brings me to my 2021 Personal Quilting Challenge #1. These are my objectives which I hope to have done by February 23rd.

Fortunately I have another 23 days. I best get a move on it.

This brings me to the 350 Blocks report over at Prairie Moon Quilts.

  • 350 Challenge = 56
  • Easy Breezy = 101

I think that’s everything.  Let’s see what February has to offer.

Another Section is Complete

The 3rd section of the quilt is sewn together. And from the scraps I make another Easy Breezy block.  It was tempting to work on the MQA BOM as the last 2 blocks were released, but I remembered my One Monthly Goal and the only way I’m going to finish the rest of the top this month is if I don’t get distracted.  There will be plenty of time to accomplish my challenges from my personal challenge.

  • 350 Challenge = 56
  • Easy Breezy = 101

 

Moda U is Finished!

Moda U is now complete!  This quilt was a Block of the Month in 2007-2008.  I finished the top timely, but it waited to be quilted.  The quilting took place in  September and October of 2020. It got pulled off the machine at least once to quilt something else and once to turn it to do the borders.

The thread is Antique Gold.  Most of the quilting was done using the computer on my Innova, setting it up one block at a time.

The quilt measures 61-1/2″ by 81-1/2″ after washing.

This quilt is one of the tasks on my Personal Challenge # 1.

 

Finished (or Not) Friday – 1/22/21

No new pictures, as Thursday evening was a long night at work. So here’s a recap of what I’ve accomplished in the last 7 days.

Runabout Bag by Lazy Girl Designs. I was able to cross this off my 2021 Personal Quilting Challenge # 1.

Not thread and needle, but I made a Mardi Gra mesh wreath.

I’m well on the way to finishing the 3rd quarter of the wedding quilt.

I just have one short end of binding to stitch down on Moda U.

  • 350 Challenge = 35
  • Easy Breezy = 96

I’m linking up with Alycia Quilts for Finished (or Not) Friday.

Getting Stuff Done

This morning my Guild had a Zoom Sew Day.  Nearly 20 of us joined the Zoom call from our individual sewing spaces.  We talked, laughed and worked on our projects. I feared the sewing machines would be too loud, so I started by first cutting the fabric for this Runaround Bag by LazyGirlDesigns.  Once it was done I started cutting the HST for the next section of the wedding quilt. I made the bag after I got off the call.  As simple as the bag was to make, I didn’t feel I could concentrate on the instructions and participate in the call at the same time.  This is an item on my 2021 Personal Quilting Challenge #1.

By then we all realized the sewing machines were not too loud so I stitched, pressed and trimmed all of the seafoam HSTs I need for the next section.  Had I not been on the call, I doubt these would be finished.

My evening project was this wreath.  I think it needs more embellishments before I can call it done.

  • 350 Challenge = 35
  • Easy Breezy = 96

2021 Personal Quilting Challenge #1

This past year I found that if I had a hard date I could challenge myself and make significant progress on my projects. The Guild program for February is Member Show and Tell.  Although the Guild is meeting via ZOOM, we really haven’t had Show and Tell.  I would like to have something to show that I haven’t posted in our FB Group Chat.  The title of this post is Challenge #1, so it’s possible I’ll do more personal challenges this year.

Challenge Dates:  January 1st – February 23rd. (Six weeks)

Challenges:

  • Alphabet BOM – Complete the top, I have a plan.
  • MQA BOM – Assuming the rest of the tops is released I’d like to get at a minimum the rest of the blocks made.
  • Red, White & Blue Wonky Broken Dishes – Quilt and Bind.  This is what I want to show at the meeting.
  • Moda U – finish the binding.
  • Ruby’s BOM – I’d like to get at least the next 4 blocks made and instructions written.
  • Runaround Bag – Everyone needs a new start on occasion. This is mine.
  • Wedding Quilt – Finish the top.

Stretch Challenges:

  • Wedding Quilt – Quilt, bind, label, and make pillowcases.
  • Ruby’s BOM – Finish the top and complete the instructions (12 blocks total)
  • MQA BOM – Finish the top

Double Stretch Challenges:

  • Ruby’s BOM – Quilt, Bind, and Label
  • MQA BOM – Quilt, Bind, and Label
  • Alphabet BOM – Quilt, Bind, and Label

I’ll continue to do daily-ish posts, leaving the challenge post to once a week, or whenever I cross something off the list.

  • 350 Challenge = 16
  • Easy Breezy = 93

 

 

 

2020 Final Countdown Recap

It’s time to do my 2020 Final Countdown Recap.  Shelly over at Prairie Moon Quilts hosts the Final Countdown each year so we start the new year with a clean(er) sewing room.

Task One was Clear Your Main Work Surface.  Here it is 7 days into the new year and the main work surface still only has the current project on it.

Task Two was Fabric Storage and Stray Fabric Piles.  The above picture shows one of my biggest problem areas. It’s still a mess, but it’s better than it was.

Another place was the fabric  shelves.  Most of the fabric was backings, so they are now stored with my quilt tops.

Task Three was Take Stock /Organize/Deal with UFOs.

I did a several things here.

  • Passed 4 unfinished projects to friends and family
  • Sorted my quilt tops. I’ve now have a box of tops with the fabric I’ll need to make the backing and a box of tops with wide backs, no backing and backings without tops.
  • Finally started the binding on my ModaU quilt which was quilted several months ago.

The sewing room is not perfect.  I still have a pile of fabric on the sewing table to enlarge the backing for Frolic, and if I load anything on the longarm, I’ll have to move a couple of bags, but I think the room is in a better place than it was.

There was a bit of piecing as well.  I finished the lavender Broken Dish units for the wedding quilt and pressed and stitched a few seafoam HST.   Those finished seafoam Broken Dish units were from before.  I need 32 of each color for the next 16 blocks.  Even with this progress, neither my 350 Challenge # nor my  Easy Breezy # has gone up.

 

  • 350 Challenge = 15
  • Easy Breezy = 92

Tuesday’s Progress

There was a bit of binding while  I watched Zoey’s Extraordinary Playlist and the second half of The Lion King.  Then I got up and went to the sewing machine.

All of the lavender HSTs are sewn and pressed.  I’ve even started assembling the broken dish units.

Tonight I’ll review my Final Countdown Challenges to see where I stand.  I think it’s a case of progress is made, which is definitely a step in the right direction.

  • 350 Challenge = 15
  • Easy Breezy = 92

HSTs and Binding

Have I mentioned that the wedding quilt has a gazillion HSTs in it?  Yesterday I cut a bunch more. After I get these sewn and trimmed, I should have enough tomake another 1/4 of the quilt.

As for the binding of the Moda U quilt, I have less that 6″ to go before I turn the first corner.

 

  • 350 Challenge = 15
  • Easy Breezy = 92