Quilting and Stuff by Knitnoid

Category Archives: Quilts

What’s on My Design Wall – En Provence Edition Part 2

part2

 

Part two of Bonnie Hunter’s annual mystery quilt came out on Friday.  It’s not too late to join. The instructions can be found HERE.

This clue has us making triangle in a square blocks. My plan was to use the Quilt in a Day rulers as I’ve had more luck with that method than the Tri-Recs, but I found the correct size strips in my bins, so I cut the first few with the Tri-Recs. Since they came out so much better than they have in the past, I’ve decided to stick with the Tri-Recs. I’m still cutting fabric, but that’s OK. Slow and steady will eventually get the quilt complete.

I’m linking up to both the Mystery Link Up and Design Wall Monday.

What’s on My Design Wall – En Provence Edition

Bonnie Hunter is hosting her annual mystery quilt. This year it is En Provence in purple, lavender, green, yellow, magenta and of course neutrals. Information about the mystery quilt can be found HERE.

Since I haven’t spent much time quilting this year, I’m hoping the mystery will get me going again. But as with most mystery quilts I do, I’m pulling from my stash. Although I love the mystery colors, I didn’t find enough for the quilt in my stash. Shopping is not an option, so I thought I would have to sit this one out (and I still need to finish Aletaire).  While I was contemplating alternative color schemes, someone on Facebook said they were going to use Christmas colors.

mysteryfinal

Yes, I can do this. Dark/kelly green for Purple, light green for lavender, red instead of green, lean my yellows toward dark/gold. Neutrals should stay the same.  But what to use for magenta? Taking a que from the Nutcracker fabric my sister gave me for Christmas last year, I chose Royal Blue. It’s the only thing not from my stash — I used a gift certificate I was given in late January, and bought extra for binding and pillowcases – $0.89 with shipping.

enprovenceclue1

This weekend I started by cutting strips, then squares. I know, Bonnie said sew strips together then cut, but I need some leader/enders to finish up Alietare.  Two 4-patches are made. I have a way to go to get all my 4-patches done.  Let’s hope they aren’t need for Clue 2 on Friday.

Head over to the Mystery Link Up to see how others are doing on their quilt — and remember it’s not to late to join.

I’ve also linked to Judy’s Design Wall Monday. I’m guessing there will be lots of 4-patches.

What’s On My Design Wall

retreatmystery

Today’s post is actually of my design wall! This past weekend I went on a retreat and finished the Allietare blocks — that’s the mystery quilt that Bonnie Hunter presented this past December. These are not all of the blocks, but just the one’s I tossed up on the design wall last night.

When I head to a retreat, I do my best to get up frequently and walk to the ironing board. This results in lots of progress on the leader/ender project, which currently is Tumblers.  I have all but 8 rows finished, and those 8 rows just need 3 pieces attached to them. I’ve started sewing the rows together and have 16 sewn together.

retreattumblers

It is about 70″ wide and eventually will be 80″ long.

The rest of this month is going to be crazy, so I doubt I’ll do much but repack my bags as I head out to another retreat on the 6th.

See what others are working on over at Patchwork Times.

 

A New Rotary Blade Was Needed

bluesstipwist

After cutting up all those shirts for the back of the Blue Disappearing 9-Patch and making a pile of 2″ and 1-1/2″ strips plus a stack of 5″ squares, a new rotary blade was needed in my cutter.

Last night I cut the dark fabric for my next quilt a blue/green Strip Twist. Up next are the lights/neutrals.  I’m taking these pre-cut strips to the retreat next weekend.

Ready To Sew

shirts

Well, ready to sew may be a bit premature. But, I have 90 10-1/2″ squares – half light, half dark and a stack of 5-1/2″ shirt squares ready to layout into a backing for the Blue Disappearing 9-Patch. There’s also a stack of 2″ and 1-1/2″ strips for a future quilt.

What’s On My Design Wall

shirts0405

Off and on all week I’ve been working on the shirt backing. I’m cutting 10-1/2″ and 5-1/2″ squares, then from what’s left, I’m cutting 2″ and 1-1/2″ strips. The rest of the shirt goes into my shirt scrap box. Ideally, I need 90 large squares and 20 small squares as I need the backing to be 95″ x 100″. I think I’ve got 24 large squares cut so far.

But I felt the need to piece. So instead of pulling out any of my numerous UFOs that could be worked on, I pulled out Tuscan Sun, the JoAnn BOM from 2006 that my mom collected.

joannbom

I didn’t get far. The pieces are pre-cut, so no thought required there and just what I needed. Unfortunately, either the cutting was off or my piece was off. I suspect it’s a little bit of both.  Each quarter section is supposed to measure 8″ unfinished. They do not. So this is going to require a bit of thinking.  For now, I think the whole thing is going to get put back in its packaging and put back on the shelf.

But I did make progress on the Tumblers.

tumblers

A group of 8’s  sewn into a group of 16 (there is a dark tumbler just outside of the picture on the left.)

Now back to cutting shirts.

See what others are working on over at Patchwork Times.

Changing Direction

ablock

Just to say that I have, I made one blocks for Alletore. The pieces are now packed away. I’ve also folded up the rest of the fabric, including that for the setting triangles and bundled it together. The project box and fabric bundle will go with me to the quilt retreat next month.

So, to the change of direction. I have two quilts that I really need to finish, and have picked the backing of the Blue Disappearing 9-Patch to work on next. What can I say? I really want to work on the Tumblers, but can only do that as a leader/ender and piecing the backing will allow me to do that. But first I have to cut the squares for the backing out of what’s left of the shirts.

Would you believe this backing will be the 12th top/backing I’ve made from the shirts? – Oh wait — I forgot about the Alphabet Blocks since they haven’t been set yet. So, that’s 13, not including the occasional use of shirting is various blocks. Needless to say, the there’s not much left to the shirts.

shirtscraps

Since, I’m a Scrap User’s System convert, there’s too much fabric to just throw away, but quite frankly, I’m not sure what to do with it. For now, it’s going into one of the shirt bins, nice and flat.

restofshirtw

Here’s my stack of cut fabric — 10-1/2″ square & 5-1/2″ squares for the backing and 1-1/2″ strips and 2″ strips.

shirtcut

I see a whole lot of cutting in my future. Perhaps I should change the blade on my rotary cutter.

What’s On My Design Wall

Clue4-Done

Clue # 4 of Alletore is done! Now on to Clue # 5. Oh wait. I didn’t get that clue downloaded and saved. But no fear – I can use Clue # 6 to back into Clue # 5. This evening I’m going to finish the cutting which I’ve skipped — the pieces for the outer edge of the quilt center and then pack everything together so I can work on other projects which need to be finished sooner than later.

tumblers0418

Meanwhile, the  Tumbers Leader/Ender project has been moving along. 400 more seams and then I’ll be ready to sew rows into a quilt top.

Check out what others are working on over at Patchwork Times.

Clue # 3

clue3

I’m plugging along on Allietare, finishing clue # 3 last night while listening to the ball game. Now it’s on to clue # 4 where I need to begin by cutting fabric.

What’s On My Design Wall

dw0411

Work & life continue to cut into my quilting time more than I would like, but I was able to spend several hours working on last year’s mystery quilt. This past weekend I spent most of my quilting time simply cutting fabric and digging deeper looking for more golds and blacks.

I’m going to allow myself one more week of “quilting for me”, then I have several projects that I must get done.

See what others are working on over at Patchwork Times.