The month is over, so how did I do? Well, not as good as previous months, but it could have been worse.
* Keep up with the SBS BOW – Done
* Finish the hand quilting on Josh’s Quilt – nope – two thirds of the last block remains
* Finish piecing the DWR – nope – one row is ready to attach and the last row needs putting together
* Hand quilt 2 rings on DWR – obviously not
* Complete Finishing Instructions for both sizes of Kansas Spirit BOM – The smaller quilt instructions have been turned in!
* Machine quilt borders on Josh’s Quilt – obviously not
* Make at least 4 make-up SBS blocks
* Decide on the quilting for Jeremiah’s quilt – didn’t even look at it.
* Work on Ladder to the Star sashings – finished and got the center completed
* Keep Scraps Cut Up – did this, not that there was much to do
I also made a pineapple block to try out a new-to-me technique.