Quilting and Stuff by Knitnoid

October 2009 Quilting Goals

More of the same this month.

* Keep up with the SBS BOW

* Finish the hand quilting on Josh’s Quilt – needs to be off the frame by 10/15

* Finish piecing the DWR – top needs to be done by 10/15

* Hand quilt 2 rings on DWR

* Complete Finishing Instructions for both sizes of Kansas Spirit BOM

* Machine quilt borders on Josh’s Quilt

* Make at least 4 make-up SBS blocks

* Decide on the quilting for Jeremiah’s quilt

* Work on Ladder to the Star sashings

* Keep Scraps Cut Up

Review of September 2009 Quilting Goals


Another month has gone by, so it’s time to review what I accomplished this month.

* Complete remaining 2 sets of blocks for the SBS Brown/Blue Swap

Finished and in the mail by 9/8

* Keep up with the SBS BOW

It was close, but all blocks were made and turned in on time.

* Work on Josh’s Quilt – needs to be off the frame by 10/15

3 1/2 blocks hand quilted — 1 1/2 blocks to go!

* Work on DWR – top needs to be done by 10/15

12 rings added to the quilt and 6 more are partially pieced

* Complete Finishing Instructions for both sizes of Kansas Spirit BOM

Small quilt needs one more correction. Large quilt about 50% done. (the easy 50%) 🙂

* Quilt a baby quilt

Ran out of time.

* Keep Scraps Cut Up

Well my scraps were cut up, but my friend’s scraps have filled the basket back up!

I also cut the gold fabric for my Ladder to the Stars quilt and I managed to not start anything new. What more can a girl ask for who has more UFOs and Quilt Tops than she can count on her fingers and toes?

Next month will be more of the same. I’ve got my list ready to go.

SBS Block Due 10/4


L3 – 54-40 Or Fight

This block has a template for the background triangle, but I’m not a big template fan when there are other options. Quilt In A Day has a set of Triangle in a Square rulers which I use, but since this a a six inch block, they were too big.

Then I remembered. I have a set of Tri-Rec Tools. I don’t know when I picked these up or why, but they worked great for this block.

What’s On My Design Wall? – 9/28


Does this look familiar?

Very little piecing got done this past week. It was a combination of the 5 hours of Dancing With the Stars and then spending the weekend away from my sewing machine. I still think I can meet my self imposed deadline of Oct 15th even if I add a row of rings. Of course if the extra row gets added I needed to finish the quilt 6 weeks ago to give me a week to quilt each ring….

See what others are doing by checking out the links over at Patchwork Times.

SBS Block Due 9/27


C2 – Wedding Ring I

I stumbled upon some ‘onion skin’ paper this weekend. It made a decent foundation paper.

Stash Report Week # 39


Since I’m focused on my DWR and my nephew’s quilt, there seldom is anything outbound except for a tiny bit used for the Sylvia’s Bridal Sampler block. Well, as I write this, I haven’t gotten the SBS block made, but I have prepared part of the fabrics I’ll need for the sashings to my 6″ Ladder to the Stars quilt. If I travel with my DH to String Romp, while he is rehearsing the youth orchestra, I’ll sew on my sashings. I need 80!

Inbound, I purchased nothing. However I won a Halloween Panel and V brought back a FQs from her trip to Idaho.

Fabric Added this Week: .875 yards
Fabric Added to Date: 281.583 yards

Fabric Used this Week: 1.375 yards
Fabric Used to Date: 73.879 yards

Net Stash: +207.704 yards (162.583 was gifted)

See how others are doing with their stash over at Patchwork Times.

The Stash


Judy has done it again. She’s challenging us to show our stash and then to make a dent in it by the end of 2010. Between now and January 1 the idea is to get it organized.

Well, mine is organized, so I just need to see about making a dent in it.

Here’s the tour:

Top left – Kits. There are 2 or 3 that I bought already kitted up, the rest I’ve pulled together, but haven’t gotten to. I’m doing my best to stay focused on the UFOs and working on a kit would generate a new UFO — or at least a new top needing to be quilted.

Top Right – Scrap Basket. I have not generated any new scraps from stuff I’ve worked on since I made such progress this past summer. It’s piled high again from my friends’ generosity — and I threw the back of a quilt in on top.

Middle – Music Stash. I started collecting music themed fabric the summer of 2003 to make a quilt for my DH. The quilt top is complete and this is what I have left over. I’m going to piece the quilt back from some of this, but there is more than enough to make several music themed quilts.

Bottom – The Shelves. This is the rest of the stash. On the top of the left shelf are UFOs, the next three shelves is my primary stash — anything smaller than a yard. The bottom shelf contains the yardage. On the right tops shelf are finished quilt tops and birthday FQs, the next shelf down is thread, stabilizers, some batting and a couple of small finished quilts. The bottom visible shelf contains the precut pieces, baby and Christmas fabrics, panels and the vintage fabric. The bottom shelf holds magazines and books.

So what would I like to see happen in my stash? Reduction of UFOs – preferably into finished quilts and not just tops. Some of the kits worked up and a dent in the music fabric drawers.

We’ll have to wait and see what the next 15 months bring.

Won a Prize



Burton over at Quilting Literati ran a contest for finishing UFOs. I was one of two winners. She sent me this pincushion and Halloween panel.

Thanks Burton!

Another Block Finished


I promised I worked on my DWR. I sewed the arcs to nine melon sections and added the corner stones to two of those. Then I quilted. Since this block was so easy, I pushed myself and kept working on it during the news and the first part of the Tonight Show.

Tomorrow I need to work on this week’s SBS BOW.

One More Row of Blocks


I got an extra 2 hours of quilting in tonight with the premier of Dancing With the Stars. So, I finished up this block tonight. That leaves just one more row of blocks to quilt and I’m about 1/4 of the way through the first of the last three blocks. The question now is will I get any sewing done on my DWR?