This is a paper pieced block. When I saw the announcement this morning I thought it would be quick. What I failed to remember is that these tiny 6″ block take as long if not longer than a 12″ block. I’m off to work on the music quilt now.
Batting and Basting Pass Quality Control

After finishing the basting last night on my DWR and loading it into the frame, I carefully folded up the excess off the back of the frame and propped it on a crate. The excess to the side I flipped onto the frame.
But this did not prevent Seven from doing her job as Quality Control Cat. She must like the Quilters Dream Cotton Request that I’m using and she appears to have no issues with the way I basted the quilt.
I think I’m going to look for a couple more sets of bicycle pants clips….
What’s On My Design Wall
Technically, I still have Ladders to the Stars hanging on my design wall. However, for this week’s report I’m showing that I’ve gotten my Double Wedding Ring into the frame.
I basted with a combination of basting spray and #1 pins. There are spots which simply don’t lay flat. This was never intended to be a show quilt, so I’m OK with that. Or maybe I simply want it done, so I’m willing to over look things. Either way, I plan on starting the quilting this evening. My plan is to spend 30 minutes a day on this quilt.
The music quilt is up next.I’ll baste it tonight so I can start the machine quilting. I’d like to have it finished by next week, to take to the guild meeting but I’m beginning to wonder if I’ll get it done. Saturday is my nephew’s wedding to no quilting then, but I’ll have all day Monday instead to work on it. Of course the Sylvia’s Bridal Sampler BOW will be announced. I’ll need to get that worked in by Sunday night. I’m thinking something is not going to get done.
This will be especially true if I spend much time checking out other quilters’s design walls by following the links over at Patchwork Times.
Stash Report

After what seems like months of me saying I’m going to put the borders on Ladder to the Stars, I’m happy to report that they are done! In addition to this top, I made 4 swap blocks, a SBS block and 100 pickets for Oklahoma Backroads. All had fabric I can count in this week’s report.
There was no fabric in, and I spent an hour in a quilt shop. Admittedly signing up for the UFQ Program — UnFinished Quilts. I’ve picked 5 quilts that I want to make significant progress on — 4 are to be completed and bound, the 5th on I’m just aiming to get the top complete.
Here are the totals:
Fabric Added this Week: 0 yards
Fabric Added to Date: 0.25 yards
Fabric Used this Week: 3.664 yards
Fabric Used to Date: 9.59 yards
Net Stash for 2010: -9.09 yards
Check out other stash reports over at Patchwork Times.
What to do with Tiny HST
When making Carolina Christmas and Oklahoma Backroads you can either toss the triangles trimmed from the blocks, or you can sew an extra seam and have tiny (finish at 1 1/2″) half square triangle (HST) units. I picked the latter and have a shoe box full of them.
But what to do with them? One suggestion was to make an Ocean Waves quilt – which is also on Bonnie Hunter’s website Quiltville.com. However, since half of my squares are pink and white and the other half are simply light and dark, I can’t visualize my pieces as an Ocean Waves quilt. So, I keep tossing my HST into the box waiting for inspiration to strike.
Then this morning while I was looking for something on Quilter’s Cache I found my inspiration. The Depression Block.
This is what I came up with in EQ. I think I’ve found my next new quilt project.
Let’s Hear It for Knee Pads
The thing I like least in the quilting process, is crawling around on the floor squaring quilts up. It’s not the squaring up, but rather the crawling around. It just hurts my knees. This is especially true now that I pulled the carpet up in my studio to expose the hardwood floors. We won’t even talk about working on tile over concrete. After I came home from last spring’s quilt retreat where I squared up and attached borders to 3 quilts, I decided I had no choice but to find some knee pads. I found these in our garage. I’m not sure why we bought them, but they now live in my studio.
Why is this pertinent? Before I could measure for the borders I had to square up Ladder to the Stars. The quilt is now square, and the millions of strips cut for the borders. OK, it’s only 32 strips the width of the fabric and 4 strips the length of the fabric, but it seems like millions now that I’m sewing them together. I stopped after one set to verify that I have the proportions correct, although I probably should have done that BEFORE I cut all the strips. Here it is with one strip set folded to miter around the corner.
I think it is going to work. I’ll see how far I get with the strip sets, but I doubt I’ll try to attach them to the quilt tonight.
Wind-Up for the Weekend
Tamara is hosting Wind-Up for the Weekend. It’s a chance to show what you are planning to work on over the weekend. The first thing I’m planning on doing is trying to stay warm. They are predicting -20 degrees farenheit plus wind chill overnight. At least I won’t be watching over goats in the cold.
On to the quilting. Ladder to the Stars needs borders. No hurry on this, just that I posted I would do it by the end of the month, but before I started basting my quilts. Both the DWR and music quilt need basting so I can start quilting them. I would like to have the music quilt finished so I can take it to the guild meeting on the 18th. The DWR needs basted so I can start quilting – I want to get 4 rings done by the end of the month.
Check back to see what I get done.
Borders or Basting
The SBS BOW is done and the swap blocks for both January and February are done, so if I follow Wednesday’s plan, it’s time to tackle the border on Ladder to the Stars. The only problem with that plan is I’m itching to start the quilting on both the DWR and the music quilt.
It’s late, so we’ll see what tomorrow brings — besides blowing snow and freezing weather.
SBS Block Due 1/10
Last night I threw up my hands in frustration. I’ve worked with 45 degree diamonds before so I wasn’t expecting any issues. Ha!
First off the centers didn’t match — honestly, that was to be expected. So I ripped and started sewing again. The centers matched beautifully. That’s when I noticed I had yellow points instead of a red and blue point. Eventually, I ripped again and re-sewed. This time all was good. We won’t discuss the setting triangles and squares. Nearly all of my previous diamonds were appliquéd (there’s that word again) to the background.
I sent an e-mail to the SBS list and then Mary posted here that she was now concerned about making the block. Truly, the diamonds are easy so I’m going to show a brief photo tutorial on how I made them. It may not make sense if you don’t have the book.
#1 – after sewing the two strips sets, cut the strips as directed, making sure the colors are oriented the same way and the angles are a like.
#2 – Flip the diamond piece on the right so they are oriented correctly.
#3 – flip the piece on the right over on top of the piece on the left. Make sure the “v” forms at 1/4″. This is the seam allowance.
#4 – This is a trick I picked up along the way. I’ve drawn my needle line and 1/4″ either side of it on a straight piece of cardboard and taped it to my sewing machine. There are notions out there you can buy (and I have some of them — not that I can find them when I need them).
#5 Line up the top “v” with the needle and the bottom “v” with the line on the guide. Stitch the seam.
#6 – Open up the diamond. I promise there are no camera tricks here and I didn’t re-stitch it.
When I work with larger diamonds I pin, but I was finding that pinning on these tiny pieces was causing part of the problem. Hope this helps someone.
QA Wednesday
Quilting Accountability.
Over the weekend I worked on Carolina Christmas and got through the first part of step 4. At that point I needed to cut more fabric, and if I did, I would continue to work on it when I really needed to finish the DWR so I can start the hand quilting. So, I temporarily set aside Carolina Christmas, and finished up my DWR piecing last night.
I’m participating the Sylvia’s Bridal Sampler BOW, so I will finish piecing this week’s block and a couple of swap blocks before tackling the borders on Ladder to the Stars. I continue to work on Oklahoma Backroads as my leader/ender.
It is my intention to sandwich both the DWR and the Music Quilt this weekend so I can start quilting them next week. As long as my wrists holds out I’ll spend 30 minutes each day on the DWR. I expect the music quilt will take me several evenings to machine quilt.
Thanks Bari for starting the Accountability Challenge.





















