Quilting and Stuff by Knitnoid

Category Archives: Tablerunner

40 Day Challenge – Day 4

This afternoon I bound this table runner. I made it to test a pattern I wrote, pulling fabric from my stash.  The fabrics didn’t work as well as I hoped, so it sat for 7 years before I quilted it.  Then it sat in the to be bound pile for 7 months until I found fabric to bind it with. Because I’m lazy I used Susie’s Magic Binding. I have to say that pop of dark green sets if off and now I think the fabrics work.  Or maybe it’s just because it’s finished.

Next up was the first pair of pants to be hemmed. When I realized I was going to have to CUT the pants, I wanted confirmation of the length. It’s a good thing I asked. My niece realized there have been some substitutions since she gave me the pants back in February/March and needed to double check the sizes/length. Someone must be taller as there is one pair I don’t have to hem.

While I was wait to hear from my niece, I started looking for fabric to bind Now and Later, which I’ve been calling Then and Now.  Well, actually I started to look for fabric to bind Narragansett Blues, but I realized I either used the fabric, or never had any to begin with. Since I’m not ready to tackle the binding for Allietare, Now and Later moved to the top.

I’m not sure what I planned to bind this quilt with – possibly blue given I quilted it with blue, but I like the green and yellow.

That leaves the following:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 3

Yes, I skipped Day 2.  I was playing with the Sherwin-Williams app. My room needs updating  – starting with ripping out the old powder blue carpet. The curtains are from when we moved into the house 21 years ago. I’d like something dramatic, but whatever I go with paint wise it has to go with my quilts and the bedframe can’t blend into the wall. Merlot may be the ticket.

In addition to these two quilts (Egg Money an Eleanor Burns pattern  & En Provence a Quiltville Mystery quilt) I will also have my black, blue, gray & white Frolic (also a Quiltville Mystery quilt) and a Hancock Fabrics BOM which I’m enlarging.

So what did I get done on Day 3? I bound the Customer quilt (delivering it Sunday afternoon) and made a pillowcase to go with it.

I also bound Sister Swap # 3.

 

That leaves the following:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 pair of pants which need to be shortened.
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

My plan for tomorrow is to tackle the first pair of pants and bind the tablerunner.

40 Day Challenge

I’d like to get back to blogging about my quilting. It seems that I generally just post to Facebook anymore.  In one of my Facebook groups someone asked “What are you working on?” For me this morphed into this 40 Day challenge. My goal is to get everything on this list done.

This first picture is a stack of quilts that need to be bound.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down
  • Then & Now
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use

Believe it or not there’s more work in this pile than the binding pile.

The quilt with the striped backing needs a label and delivered

I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.

The log cabin quilt needs to be quilted bound and labeled.

The blue, black and white quilt is my Frolic the goal is to finish the top.

Although not quilting, there are 9 pair of pants which need to be shortened. This is driving the 40 days.

Bonus #1: Pillowcases for the customer quilt, Allietaire, Narragansett Blues, and the log cabin quilt (2)

Bonus #2: Pillowcases for quilts already completed – Christmas Crazy 8s, On Ringo Lake, En Provence (2), Carolina Chain, Good Fortune

Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

It should be an interesting 40 -45 days.