Quilting and Stuff by Knitnoid

Category Archives: 2015 -350 Blocks

September Recap / October Goals

September was a very productive month for me. Crazy Challenge II seems to have gotten me going.

Over the month I pieced 3 quilt backs. They are for the Green Disappearing 9-Patch, Aiming for Accuracy, and Nifty Thrifty.

Sept_Backings

Seven pillowcases were made – I still need to make the one to go with Nifty Thrifty.

Sept_CasesAnd I finished 4 quilts – Out of the Blue, the Orange Disappearing 9-Patch, Nifty Thrifty and Diamond Links.

Sept_quilts

 

For the block count over at Prairie Moon Quilts, I’m counting 20 blocks which went into the Aiming for Accuracy backing. That brings my block total for the year to 584.

UFO Busting 2015

Now for the UFO Busting Report. I’ve dropped below 60 UFOs!

  • Projects In Process September 1 – 63
  • Projects Completed – 5 (I’m counting the extra pillowcases I sent w/Out of the Blue as a project)
  • New Projects started – 1
  • UFOs re-purposed – 0
  • Projects in Process September 30 – 59

So, what’s on tap for October?

  • Piece the last shirting back
  • Complete SBS swap block quilt
  • Complete Orange Crush*
  • Complete Aiming for Accuracy*
  • Complete at least one Disappearing 9-Patch

Bonus: Complete Sew Scrappy top, 2nd Disappearing 9-Patch, Compass Lone Star or Green & Cream Swap

*The Pink & Brown quilt and the Black & White Strip Twist might be substituted if they are needed in early November, pushing the listed two quilts out to November.

June Recap / July and 3rd Quarter Goals

I may not have sat at the sewing machine much in June, but I made the most of the time I had at the machine.

The smaller of the three Disappearing 9-Patches became a top:

davidsquilt

About 1/3 of the second DP9 blocks are made and 22 of the Sew Scrappy Blocks are done:

dw0615

3 Star-A-Day Blocks were made:

3Star-A-Day

That’s 165 blocks for the Prairie Moon Quilts 350 Block Project.

There is nothing to report on for the UFO Parade, but others had finishes in June.

So what’s on the agenda for July and the 3rd Quarter?  Well, more than I realistically can get done even if we weren’t still working in the backyard, aka “The Jungle”.

On deck are the following.

  • Finish the red DP9. What’s not on the design wall is sitting here next to the sewing machine.
    reddp9
  • The Green DP9 is currently my travel project — not that I have lots of plans for traveling.greendp9
  • Finish the Sew Scrappy top. All that is left is the rest of these blocks. I need 38 more, then I can start assembling the quilt top.
  • sewcrappy2I would like to get Diamond Links finished.  The last couple of rows and the borders need quilting.DiamondLinks
  • Finally, in July I’d like to get more stars made for the Star-A-Day quilt.

The rest of the 3rd Quarter goals for the 2015 Finish-A-Long include new projects (shh! I’m supposed to be working on my UFOs.)

newprojects Squedge Ruler project, “August A”, the Hardware quilt and a Triangle Frenzy table runner.

UFOs are on my list. These tops need borders, more blocks, or setting together (the orange and purple is Orca Bay and it was finished in May!)

nottopsyet

Candy Sunflower Seeds, Star-A-Day , String HST, Sister Swap Blocks, Alphabet BOM

And last, but not least there are quilts that are partially quilted.

quiltasyougo

Cream & Green swap, Whitework, Hancock Star BOM, a quilted sweatshirt & the Compass Lone Star

Along the way I’ll be working on the new Bonnie Hunter Leader/Ender Challenge – Tumblers.  I’ve already started by cutting a tumblers from my 2-1/2″ shirt strips that were previously designated at “Rectangle Wrangler” so this does not add to my UFO count.

tumblers

Well, I’m off to stitch a few DP9 blocks to say I’ve sat at my sewing machine today.

May’s Progress / June’s Goals

Here it is the first of June and time to check on my quilting goals. Except for the Star-A-Day (my husband is calling Star-A-Week) I got everything done.

  • Finish the graduation quilt by the 16th – Donegradquiltdone-top-tweak
  • Finish Orca Bay – Doneorcabaydone2
  • Trace and cut stars for the Star-Every-Other-Day Quilt (I’m not even certain I can pull that off – we’ll have to see) – Didn’t touch!
  • Regroup on Sew Scrappy – Donesewscrappy-cut
  • Cut squares from my recycled shirts and associated solids for 3 different Disappearing 9-patches in preparation for the Retreat. – Donedw0525-2

Finishing Eye Fooler allowed me to add to my Block Count over at Prairie Moon Quilts.

  • 350 Block Report: 27 for a total of 151 – ahead of the year to date goal of 140

The UFO Busting Report with these finishes and starts looks like this:

  • # of Projects in Process May 1st: 63
  • # of Projects Completed: 2 (Orca Bay & Eye Fooler)
  • # of new Projects started: 3 (3 DP9)
  • # of projects declared orphans 1 (2011 BOM)
  • # of Projects in Process May 31th: 63

So, what’s up for June?

  • Complete the 3 Disappearing 9-patch tops
  • Complete the Sew Scrappy top
  • Finish Diamond Links
  • Make progress on the Star-A-Day quilt

Will I get everything done or get diverted by another project? Only time will tell.

The Graduation Quilt Is Finished!

The Graduation Quilt is finished and delivered.

gradquiltdone-top-tweak

gradquiltdone-border detail

 

  • Pattern:  Eye Fooler from Quail Valley Quilts
  • 16 3/4 yards of fabric in top, backing, binding and pillowcase
  • Batting: Hobbs 80/20 Black
  • Top Thread: Superior Threads So Fine! Color # 722 – Crickey!
  • BobbinThread: Superior Threads Super Bob – Black (nearly 2 size M’s)
  • Quilting design: AMPANTO03 Curly Q by Aimee Mahan
  • Quilting time: approximately 3 hours
  • Binding: Susie’s Magic Binding
  • Size before washing: 78″ x 96″
  • Size after washing: 74″ x 90″
  • Started: 2/18/15
  • Finished: 5/15/15

This quilt was on my UFO list in several challenges. I’ll add the links when the corresponding post goes live.

Stash Report / February Recap

gradquilt-pieces

 

A whole lot of fabric passed under my needle this past week – the majority of it at the retreat Friday and Saturday. Most of the units needed for the blocks for the graduation quilt  are made.  I still need all of the HST in both sizes and the triangle in a square units for the outer blocks. That pile in the top right corner is the start of the block assembly.

Stash Report: – Reported at Patchwork Times

Fabric Added Since Last Report 0.25 yards (FQ from the retreat)
Fabric Added to Date: 18.91 yards

Fabric Used Since Last Report: 0.75 yards (Orca Bay Borders)
Fabric Used to Date: 16.964 yards

INCREASE in Stash to Date:  1.946 yards

350 Blocks Report at Prairie Moon Quilts

I reported 23 blocks.  I counted the Orca Bay pieced border as 10 and I finished 13 stars.

orcabay-top

staraday-february

I have nothing to show for the UFO Parade at 52 Quilts in 52 Weeks. Orca Bay only made it to the top stage.

UFO Busting Link Up

  • # of Projects in Process February 1st: 66
  • # of Projects Completed: 0
  • # of New Projects Started: 1
  • # of Projects in Process February 28th: 67

 

 

January 350 Block Report

 

I thought  I was aiming for 31 blocks (which I missed) but I read over at Prairie Moon Quilts we only needed 20 this month.  So, what did I get done?

  • Two Christmas BOM blocks (which I forgot to photograph separately)bomblocks
  • A hug block which I forgot to photograph before sending it off
  • Six Alphabet BOM blocksBlocks 1-6
  • 15 Star-A-Day blocksstars-15
  • and fixed 16 String Geese (had to re-attach the “sky”) I’m counting these as 4.orcageese

So, for January, I have 28 blocks.  For February, I hope to get the Orca Bay top finished, start making blocks for a graduation quilt and get at least 28 more stars done.

Pop over to Prairie Moon Quilts and check the comments to see how others are doing.