Quilting and Stuff by Knitnoid

Category Archives: Challenges

40 Day Challenge – Day 5

Yesterday I decided how I’m going to bind for Narragansett Blues. I’ll use the blue backing fabric for the binding with the gold as the flange. But that’s not all I did.

I unpacked 2 boxes from the office. I haven’t posted about the changes I’ve made in the living room.  I painted, put in new flooring, purchased a new sofa and recliner and rearranged the furniture.  All of this required moving everything out of the living room and dinning room.  I think there were 32 small moving boxes of books and nicknacks, plus various crates. Most ended up in the back bedroom.  I’ve SLOWLY been unpacking.  Perhaps I need to add unpack boxes onto my challenge.

The first box contained yearbooks. There must be another box because that cabinet was full before the shuffling began.  The second box contained photo albums.

My wedding album is what is missing here. Currently it is on the hearth.  The “leather” cover has gotten sticky over the years so I need to do something so it doesn’t tear up the finish on the table.

But back to the real challenge.  I hemmed 2 pair of pants!

That leaves the following:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
    • 2 pair hemmed 6/8/2020
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 4

This afternoon I bound this table runner. I made it to test a pattern I wrote, pulling fabric from my stash.  The fabrics didn’t work as well as I hoped, so it sat for 7 years before I quilted it.  Then it sat in the to be bound pile for 7 months until I found fabric to bind it with. Because I’m lazy I used Susie’s Magic Binding. I have to say that pop of dark green sets if off and now I think the fabrics work.  Or maybe it’s just because it’s finished.

Next up was the first pair of pants to be hemmed. When I realized I was going to have to CUT the pants, I wanted confirmation of the length. It’s a good thing I asked. My niece realized there have been some substitutions since she gave me the pants back in February/March and needed to double check the sizes/length. Someone must be taller as there is one pair I don’t have to hem.

While I was wait to hear from my niece, I started looking for fabric to bind Now and Later, which I’ve been calling Then and Now.  Well, actually I started to look for fabric to bind Narragansett Blues, but I realized I either used the fabric, or never had any to begin with. Since I’m not ready to tackle the binding for Allietare, Now and Later moved to the top.

I’m not sure what I planned to bind this quilt with – possibly blue given I quilted it with blue, but I like the green and yellow.

That leaves the following:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now 6/7/2020
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use – 6/7/2020
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 8 pair of pants which need to be shortened.
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

40 Day Challenge – Day 3

Yes, I skipped Day 2.  I was playing with the Sherwin-Williams app. My room needs updating  – starting with ripping out the old powder blue carpet. The curtains are from when we moved into the house 21 years ago. I’d like something dramatic, but whatever I go with paint wise it has to go with my quilts and the bedframe can’t blend into the wall. Merlot may be the ticket.

In addition to these two quilts (Egg Money an Eleanor Burns pattern  & En Provence a Quiltville Mystery quilt) I will also have my black, blue, gray & white Frolic (also a Quiltville Mystery quilt) and a Hancock Fabrics BOM which I’m enlarging.

So what did I get done on Day 3? I bound the Customer quilt (delivering it Sunday afternoon) and made a pillowcase to go with it.

I also bound Sister Swap # 3.

 

That leaves the following:

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down 6/6/2020
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down 6/6/2020
  • Then & Now
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use
  • The quilt with the striped backing needs a label and delivered
  • I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.
  • The log cabin quilt needs to be quilted bound and labeled.
  • The blue, black and white quilt is my Frolic the goal is to finish the top.
  • Although not quilting, there are 9 pair of pants which need to be shortened.
  • Bonus #1 – Pillowcases:
    • the customer quilt 6/6/2020
    • Allietaire
    • Narragansett Blues
    • Log cabin quilt (2)
  • Bonus #2: Pillowcases for quilts already completed
    • Christmas Crazy 8s
    • On Ringo Lake
    • En Provence (2)
    • Carolina Chain
    • Good Fortune
  • Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

My plan for tomorrow is to tackle the first pair of pants and bind the tablerunner.

40 Day Challenge – Day 1

I have the binding attached to the customer quilt.  This quilt is 96 x 107, so there is a lot of binding to do. I’m using Susie’s Magic Binding which means I should be able to finish it tonight.

40 Day Challenge

I’d like to get back to blogging about my quilting. It seems that I generally just post to Facebook anymore.  In one of my Facebook groups someone asked “What are you working on?” For me this morphed into this 40 Day challenge. My goal is to get everything on this list done.

This first picture is a stack of quilts that need to be bound.

  • A customer’s quilt – binding needs to be pressed, then can be attached and stitched down
  • Allietaire – plan do do both scallops and a 2 color binding.
  • Narragansett Blues
  • Sister Swap # 3 – The binding is made just needs to be attached and stitched down
  • Then & Now
  • Baby 4-Patch Stacked Posies
  • Tablerunner – Finally figured out what I am going to use

Believe it or not there’s more work in this pile than the binding pile.

The quilt with the striped backing needs a label and delivered

I’m behind on my Star Studded BOM. I have fabric for 11 or 12 large blocks and 23 6-inch blocks.

The log cabin quilt needs to be quilted bound and labeled.

The blue, black and white quilt is my Frolic the goal is to finish the top.

Although not quilting, there are 9 pair of pants which need to be shortened. This is driving the 40 days.

Bonus #1: Pillowcases for the customer quilt, Allietaire, Narragansett Blues, and the log cabin quilt (2)

Bonus #2: Pillowcases for quilts already completed – Christmas Crazy 8s, On Ringo Lake, En Provence (2), Carolina Chain, Good Fortune

Bonus #3: Quilt, bind, label and make pillowcase (2) for Frolic.

It should be an interesting 40 -45 days.

The Blue Disappearing 9-Patch

bd9pwindmill

Yesterday was gorgeous – sunny, light breeze, 74 degrees – not something you see often in Kansas City in February, but it was perfect for a quilt photoshoot. Ever since we cleared the jungle, I wanted to hang a line to hang quilts on.  It took two tries, as the weight of the quilt caused the first line to sag.

bd9pfront

This quilt is made from recycled shirts with the exception of the blue accent squares and binding. Even the back is from recycled shirts.

Bd9pback

I started this quilt January 5, 2016, finished the top February 24, 2016, then started working on the backing.  I finished the backing some time in June 2016 — possibly at the quilt retreat I went on.  Then the quilt sat, ageing, until I pulled it out this January and began quilting it on my treadle machine.

bd9pquilting

The binding was applied and stitched down on my main machine. I also made a pillowcase to go with the quilt using the binding fabric and a shirting that I bought a whole bolt of 10-15 years ago.

bd9pcase

This is my first finish for 2017 and is one of my 1st Quarter Finish Along Goals.

1st Quarter Finish Along Goals

1stQtrFAL

I didn’t do well with the 2016 Finish Along, but I’m going to give it another try. The 2017 Finish Along link up for proposed finished closes tonight, so I’ve pulled together a few items for this quarter.

  • Compass Lone Star — it’s been hanging around January 2007
  • Purple box bag — I started this last summer — and then misplaced the pattern which  I still haven’t found
  • Blue and Green Strip Twist – a quilt I started last summer
  • Green and Cream Swap Blocks – Started Fall 2006, I promised this for a Christmas gift — in 2015!
  • Monochromatic table runner – a class sample from last March
  • Disappearing 9-patch – from a year ago, I’d like to get it done this weekend.

Rhonda's [Quilt] Ramblings

All of these things (well, not the bag) have been on previous challenge lists. Let’s see if I can get a couple of these done by April 1st.

The Final Countdown – Task Three

Shelly over at Prairie Moon Quilts is again hosting the Final Countdown — a set of tasks to clear the deck so to speak to get us ready to quilt in the new year.

Task Three – Get Committed

It’s a good thing she’s given us until the 6th to do this. As weird as last year was I really haven’t given it much thought and it doesn’t look like I was committed to anything. Blogging was minimal, no ‘quilt’ finishes, although I did make a bunch of zipper pouches and a Bionic Gear Bag — that was back in the summer and the fabric is STILL sitting out on my flat surfaces — you know the ones that were part of Task Two?

My UFO count – both tops needing to be quilted and tops I’m still piecing has gone up – by a total of 5 — if my notes are correct.  Bottomline there are 25 quilt tops in the queue and another 32 quilts I’m still piecing, including En Provence which I started Thanksgiving weekend. 

Scraps and fabric is all over the place — I have piles of fabric from both Allietare and En Provence sitting about as neither quilt top is completed. The fabric from the BGB is still sitting out as I planned to make some accessories to go with it. Shoot, my bag from the quilt retreat is still half packed.

Last year I started off in numerous challenges, but in the end I dropped out. So this year I’m going to commit to the following:

  • Complete the En Provence Mystery Quilt top – I’m working on the last two clues now.enprovencechristmas
  • Quilt the Blue Disappearing 9-patch. The top was finished in January and the pieced backing sometime the first half of the year. I’ve dug out the backing and removed the cat hair. Now both the top and backing need to be pressed and sandwiched together so I can quilt it.goal2
  • The Green and Cream quilt.  This was a Christmas 2015 UFO! I unearthed it while working on the space between the cutting board and the designwall.andrea-gift
  • The blue and green Strip Twist.striptwist
  • Process the boxes of fabric scraps into the Scrap Users System. This will need to be a long-term project as I have the equivalent of 4 or 5 book boxes (if not more) worth of scraps and my pre-cut scraps are getting thin. This task also includes putting away the fabric that is laying out and about.
  • Determine what I’m going to do with the upholstery samples I picked up off of CraigsList. There are 3 boxes in the garage and in the stack by the design wall. At first glance these are  not as usable as the one I made the zipper bags from last summer.

If I can stay focused and get these six tasks done I will be thrilled. Stay tuned.

 

 

What’s On My Design Wall – Allietare

allietarecenter

For the first Design Wall Monday post of 2017, I offer the center of Allietare, Bonnie Hunter’s Mystery quilt from 2015. I’ve been working on it as I’ve been assembling it while using the 2016 Mystery Quilt, En Provence as my leader/enders.  There are a ton of 4-patches in the new quilt.

The 6th clue came out Friday morning. But could I find either of my Companion Angle rulers? So, I had to start cleaning my flat surfaces. from the Final Countdown Task 2. The ironing board has been cleared.

ironingboard

Yes, I’ve found my ruler — not that it was on the ironing board. More cleaning was required. So, I tackled the floor. Yes, this is better.

floor

In the foreground are the fabrics I’m using for EnProvence. On the chair is a quilt that was supposed to be a give Christmas 2015. The shoebox of fabrics is from two quilts — Allietare and a StripTwist. Time to put the Allietare fabric up. They are sitting on two boxes of upholstery samples. The two laundry baskets have batting in them. The box with the yellow bag and the box it is sitting on are scraps I was given in early 2015. Perhaps I need to go through them this year. There’s a box of books/magazines that I will probably give away — need to flip through them one more time. The green crate in the corner contains ‘sewing stuff’. I went through it last night while I was looking for the ruler. Sorted, tossed and put away enough stuff that the box is no longer overflowing. I can’t say the same for the larger crate it is sitting on — more scraps and another crate of scraps under the shelf.  But no Companion Angle ruler.

That left the cutting board.

cuttingboard

I started clearing it off. Stuff had gotten piled high on it. After excavating the top 2 or 3 layers I found the ruler. So naturally I quit cleaning.  Actually, I gave up. I’ve been fighting the crud for the past few days so I went to bed.

I go back to work tomorrow, so no long days of quilting. My goal this week is to get En Provence finished and the cutting table cleared.

Check out what others are working on over at Patchwork Times.

The Final Countdown – Task Two

Shelly over at Prairie Moon Quilts is again hosting the Final Countdown — a set of tasks to clear the deck so to speak to get us ready to quilt in the new year.

Task Two – Tackle All the Flat Surfaces

Boy do I need to do this. I can’t really start on Task One until this is done as some of the stash is on the bottom and I’ll need to cut and press.

Shelly’s questions:

  • So what are your plans for your flat surfaces? – Find them. Since I’ve not been quilting much, they have become catch-alls — the cutting table, the ironing station, the floor between the ironing station and the design wall, the small table beside my sewing machine and the treadle machine.
  • Which flat surface seems to cause your biggest problems? – Generally speaking the floor — it’s a catch-all for stuff from the other rooms — although since I’ve not been sewing the cutting table is piled high.
  • How will you be dealing with this going forward? – In a methodical manner.  I need the cutting board cleared so I can stop cutting on the ironing station. The ironing station needs to be cleared so I can press a top and backing that I need to quilt sooner than later, then the treadle and small table need to be cleared so I can quilt it. That leaves the floor last which goes hand in hand with Task One getting the stash under control. I wrote this yesterday and then brought in two boxes of upholstery fabric samples from Craigslist. That and looking for the camera tripod resulted in me clearing the floor first. Although it’s more of a case of stacking neatly to make room for the new blocks. I really need to locate my companion angle ruler, so I’ll start with the ironing board and the cutting board then circling back to the floor.

It’s a good thing we have until the 6th to complete these tasks.